FIELD: rock fracture diagnostics.
SUBSTANCE: discrete element method is presented for modeling the development of a fracture in the rock surrounding a drift, which includes: taking rock columns from a coal seam in a deposit and recording RQD values, observing drift deformation and performing statistical analysis of the characteristics of the propagation of faults in the coal seam; testing the mechanical parameters of coal samples indoors and calculating the strength of the rock mass in accordance with the RQD values; creating a numerical model by using the UDEC-Trigon module to adjust parameters to match the strength of the rock mass and adjust the model parameters; and creating a design scale numerical model to adjust parameters to match the deformation characteristics of the field, and ultimately simulate fracture development in the rock surrounding the drift.
EFFECT: present invention provides accurate and basic mechanical parameters for numerical simulation of drift deformation based on discrete elements, which guarantees realistic and reliable simulation results.
6 cl, 9 dwg
Title |
Year |
Author |
Number |
COAL MINE DEVELOPMENT METHOD, BASED ON CONTROL OF PERFORMANCE OF SECOND MINING OPERATIONS, SEPARATION OF MINERALS FROM MASSIF AND LAYING OF MINED SPACE |
2019 |
- Zhang Qiang
- Zhang Jixiong
- Wu Zhongya
- Ju Feng
- Wang Jiaqi
- Chen Yang
|
RU2720029C1 |
METHOD AND DEVICE FOR CONTROL OF COAL BED UPPER PART COLLAPSE AREA DUE TO APPLICATION OF TECHNOLOGY OF PULSED HYDRAULIC FRACTURING OF A FORMATION |
2018 |
- Huang Bingxiang
- Zhao Xinglong
- Chen Shuliang
- Shao Luying
|
RU2704997C1 |
METHOD FOR MINE DEVELOPMENT OF DEPOSITS, SEPARATION OF ROCKS, FILLING OF MINED SPACE AND DRESSING OF ORE |
2019 |
- Zhang Jixiong
- Qi Wenyue
- Zhang Qiang
- Sun Kai
- Zhou Nan
- Liu Hengfeng
|
RU2724161C1 |
DEVICE FOR PLATFORM PROTECTION DURING MOVEMENT OF RETAINING END OF SUPPORT ON SIDE OF MINED SPACE |
2019 |
- Bai Jianbiao
- Wang Rui
- Yan Shuai
- Xia Junwu
- Wang Xiangyu
- Xu Ying
- Wang Gongyuan
- Meng Ningkang
- Fan Zaizhuang
|
RU2733764C1 |
METHOD FOR STAGED CONSTRUCTION OF PRIORITY PATH OF GAS MIGRATION IN COAL BED BOTTOM |
2017 |
- Lin Baiquan
- Liu Tong
- Liu Ting
- Yang Wei
- Li He
- Huang Zhanbo
- Wang Rui
- Wang Zheng
|
RU2705634C1 |
METHOD FOR SAVING SECTIONS OF DEVELOPMENT WORKINGS |
1998 |
- Zubov V.P.
- Nazarov S.M.
- Magomet R.D.
- Vasil'Ev S.V.
|
RU2134786C1 |
METHOD OF WAVE ACTION ON ROCK MASS |
0 |
- Poturaev Valentin Nikitich
- Chervonenko Alfred Grigorevich
- Mineev Sergej Pavlovich
- Babenko Veniamin Semenovich
- Prusova Alla Andreevna
|
SU1714160A1 |
METHOD FOR ELECTRICAL POWER PRODUCTION BY UNDERGROUND COAL COMBUSTION |
2004 |
- Prokopenko Sergej Arturovich
|
RU2278254C1 |
SYSTEM OF DYNAMIC CONTROLLING ROOF-BASED SEPARATION BASED ON FIBER GRATING AND METHOD OF PRELIMINARY ALERT |
2014 |
- Fang, Xinqiu
- Liang, Minfu
- Liu, Xiaoning
- Wu, Gang
- Fan, Hailiang
|
RU2630334C2 |
METHOD OF CONSTRUCTING NETWORK PRIORITY GAS MIGRATION PATHS, AS WELL AS GAS DISCHARGE AND EXTRACTION |
2017 |
- Lin Baiquan
- Liu Tong
- Liu Ting
- Yang Wei
- Li He
- Wang Rui
- Wang Zheng
|
RU2685359C1 |