FIELD: rail track maintenance.
SUBSTANCE: group of inventions relates to the field of operation of the upper structure of the railway track, in particular to devices for placing the railway track in the design position, as well as to methods for placing the railway track in the design position according to altitude marks. The device contains a track template with a rod, a base with clamps, a level and a laser pointer. The pointer is connected to the rod by an adjustment screw to fix the high-altitude position of the track before and after the repair. The method consists in determining the difference in the height marks of the top of the head of the outer rail. Marks are placed on the supports of the contact network. The measurement results are compared with the design values.
EFFECT: labor costs are reduced when laying the rail track.
2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR MAINTENANCE OF RAILWAY INFRASTRUCTURE USING DIGITAL RAILWAY MODEL | 2011 |
|
RU2466235C2 |
METHOD TO REPAIR AND RECONSTRUCT RAILWAY INFRASTRUCTURE USING DIGITAL TRACK MODEL | 2011 |
|
RU2465385C1 |
RAILWAY TRACK ALIGNMENT METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2023 |
|
RU2824765C1 |
SYSTEM FOR MONITORING READINESS OF FRONT TO CARRY OUT THE MACHINE ALIGNMENT OF THE RAILWAY TRACK | 2022 |
|
RU2793867C1 |
APPARATUS FOR LIFTING RAILWAY TRACK ON THE BALLAST | 0 |
|
SU855108A1 |
TRACK-LIFTING DEVICE | 0 |
|
SU918375A1 |
DEVICE FOR BALLAST REMOVAL FROM UNDER RAIL ROAD BASE | 2005 |
|
RU2293812C1 |
0 |
|
SU67036A1 | |
MACHINE FOR CHECKING HEIGHT OF CONTACT WIRE OF OVERHEAD CONTACT SYSTEM | 1991 |
|
RU2025323C1 |
METHOD OF, DEVICE FOR, AND MACHINE FOR TRACK MAINTENANCE | 2001 |
|
RU2230848C2 |
Authors
Dates
2022-01-21—Published
2021-03-17—Filed