FIELD: oil and gas industry.
SUBSTANCE: invention relates to the oil and gas industry, in particular to a construction of a multi-hole gas well. The construction of a multi-hole gas well contains main and at least one side trunks, while the main trunk is fixed by technical columns, a production column and a shank. The lower end of the production column is installed obliquely directly above a roof of a productive reservoir, and joints of main and at least one side trunks are placed above a sole of the productive reservoir. Moreover, main and at least one side trunks behind joints are made with the lifting of faces to the roof of the productive reservoir. The shank contains a section of solid pipes located in a descending part of the main trunk from the end of the production column to the junction with the side trunk, and then, a section of filter pipes to the bottom of the main trunk located at the roof of the reservoir.
EFFECT: increase in the reliability of a construction of a multi-hole gas well for efficient production.
3 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
DESIGN OF COASTAL MULTI-HOLE INTELLIGENT GAS WELL FOR DEVELOPMENT OF OFFSHORE DEPOSIT | 2015 |
|
RU2580862C1 |
METHOD OF CONSTRUCTING COASTAL MULTI-HOLE GAS WELL FOR DEVELOPMENT OF SHELF DEPOSIT | 2015 |
|
RU2602257C2 |
MARINE MULTIHOLE GAS WELL FOR OPERATION OF OFFSHORE DEPOSITS ARCTIC ZONE WITH SURFACE ARRANGEMENT OF WELLHEAD EQUIPMENT | 2014 |
|
RU2584706C1 |
METHOD TO OPEN AND DEVELOP MULTIPAY FIELD WITH LOW POROPERM RESERVOIRS | 2014 |
|
RU2560763C1 |
RECOVERY OF SELF-SQUEEZING GAS WELL WITH ABNORMALLY LOW SEAM PRESSURE | 2013 |
|
RU2539060C1 |
CONSTRUCTION METHOD OF MULTIBRANCH WELL | 2011 |
|
RU2456426C1 |
MULTI BRANCH, LOW PRODUCTION RATE WELL ASSEMBLY FOR SIMULTANIOUSE SEVERAL RESERVOIRS OF DIFFERENT PRODUCTIVITY PRODUCTION, IN ABNORMALLY LOW RESERVOIR PRESSURE CONDITIONS | 2008 |
|
RU2382182C1 |
DESIGN OF LOW-ANGLE OR HORIZONTAL WELL WITH POSSIBILITY OF CONTROL OF INFLOW AND SELECTIVE WATER ISOLATION | 2011 |
|
RU2480574C1 |
METHOD OF MULTILATERAL WELL CONSTRUCTION | 2016 |
|
RU2650161C2 |
DIFFICULT TURONIAN GAS PRODUCTION METHOD | 2020 |
|
RU2743478C1 |
Authors
Dates
2022-05-04—Published
2021-12-07—Filed