FIELD: oil industry.
SUBSTANCE: invention relates to a method for designing and controlling the profile parameters of a directional well. The profile of a directional well includes straight and curved sections made along a clothoid with a continuously changing curvature. The construction of a profile of a curved section with a continuously changing radius of curvature is carried out using a linear mathematical relationship that links the variable parameters of the wellbore trajectory. To build a profile, the following variable parameters of the wellbore trajectory are used: the depth of the curved section, the deviation from the vertical, and the zenith angle corresponding to the inclination of the profile tangent to the vertical axis.
EFFECT: simplification of preliminary calculations of the trajectory of a directional well, the possibility of operational control of the profile parameters in the process of drilling a well.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MAKING DIRECTIONAL WELL | 2008 |
|
RU2370620C1 |
METHOD FOR BUILDING WELLS WITH REMOTE FACE | 2006 |
|
RU2295024C1 |
METHOD FOR DIRECTED WELL DRILLING ALONG SMOOTH PATH | 2004 |
|
RU2270907C1 |
METHOD FOR DRILLING VERTICAL AND CROOKING WELLS | 1991 |
|
RU2015289C1 |
METHOD FOR DRILLING HORIZONTAL WELL HAVING DISTANT BOTTOM | 2004 |
|
RU2278939C1 |
PROCESS OF OPENING OF PRODUCTIVE INCLINED SEAM WITH PRESSURE MODE OF PRODUCTION OF HYDROCARBONS | 1999 |
|
RU2165514C1 |
METHOD FOR DETERMINING SHAFT STABILITY OF INCLINED WELLS | 2011 |
|
RU2472928C2 |
METHOD FOR DIRECTED WELL BORE POSITION DETERMINATION | 2002 |
|
RU2300631C2 |
METHOD OF AUTOMATED GEOLOGICAL SURVEY OF WELLS AND SYSTEM FOR ITS IMPLEMENTATION | 2018 |
|
RU2720115C1 |
PROCESS OF CONSTRUCTION AND RUNNING OF MULTIPLE FACE HOLE | 1999 |
|
RU2208119C2 |
Authors
Dates
2022-05-18—Published
2021-11-10—Filed