METHOD FOR DEVELOPMENT OF DEPOSITS OF HIGH-VISCOSITY OIL AND NATURAL BITUMEN Russian patent published in 2023 - IPC E21B43/24 E21B7/04 E21B49/00 

Abstract RU 2794686 C1

FIELD: oil industry.

SUBSTANCE: in the method for developing deposits of high-viscosity oil and natural bitumen, first, vertical appraisal wells are built in the area of deposits to delineate the productive formation with core sampling and laboratory tests of the core to obtain data on oil saturation, porosity, and permeability of the productive formation. Next, the structural maps of oil-saturated thicknesses are developed, referring to the productive layer thickness with a minimum oil saturation of 4.7% by weight, and vertical appraisal wells are liquidated. Then a horizontal production well is drilled 1 m higher than the bottom of the productive formation – formation thickness with a minimum oil saturation of about 4.7% by weight. Geophysical surveys are carried out to determine the geological and physical parameters along the horizontal wellbore of the production well: weighted average values of porosity, permeability, oil saturation along the length of the wellbore; then the distance is chosen between the horizontal sections of the production and injection wells, which makes it possible to create a hydrodynamic connection between the wells: the distance of 5 m with a reservoir permeability up to 0.78 µm2, a formation porosity up to 0.27 and oil viscosity under standard conditions more than 8500 MPa⋅s; the distance of 7.5 m with a formation permeability f 0.77-1.16 µm2, a formation porosity of 0.28-0.31 units and oil viscosity under standard conditions 4501-8500 mPa⋅S; the distance of 10 m with a formation permeability more than 1.77 µm2, formation porosity more than 0.32 units and oil viscosity under standard conditions less than 4500 MPa⋅s; if geological and physical parameters are varied, the minimum distance from the possible ones is chosen. A horizontal injection well is built at a selected distance from the horizontal production well above in the same vertical plane and parallel to the horizontal production well. Geophysical research are carried out to determine geological and physical parameters along the horizontal wellbore of the injection well: porosity, permeability, oil saturation. Two parallel pipes of larger and smaller diameters are run into horizontal injection and production wells. Pipe ends of smaller diameter are located at the beginning of horizontal filtration sections in the zones with the highest porosity and permeability, and pipe ends of larger diameter are located in the second half of horizontal filtration sections of wells in the zones with the highest porosity and permeability. Steam is injected into both wells to provide hydrodynamic connection between the wells. Next, the steam supply to the horizontal production well is stopped, pipes are lifted and the pump is run to the beginning of the horizontal section. Then steam is injected into the horizontal injection well and liquid is withdrawn from the horizontal production well.

EFFECT: increased technological efficiency of the development of deposits of heavy oil or natural bitumen.

1 cl, 2 dwg, 1 tbl

Similar patents RU2794686C1

Title Year Author Number
METHOD FOR DEVELOPMENT OF DEPOSIT OF HIGHLY VISCOUS OIL OR BITUMEN 2017
  • Amerkhanov Marat Inkilapovich
  • Zaripov Azat Timeryanovich
  • Shajkhutdinov Damir Kamilevich
  • Bisenova Ajnura Amangeldyevna
RU2657307C1
METHOD TO EXTRACT HIGH-VISCOSITY OIL FROM OIL ACCUMULATION 2008
  • Takhautdinov Shafagat Fakhrazovich
  • Abzjapparov Azat Valiullovich
  • Abdulmazitov Rafil' Ginijatullovich
  • Nizaev Ramil' Khabutdinovich
  • Musin Renat Akhtjamovich
RU2378503C1
METHOD FOR DEVELOPING EXTRA-VISCOUS OIL DEPOSITS (OPTIONS) 2022
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Akhmetzianov Fanil Muktasimovich
  • Zakirov Timur Faritovich
  • Akhmetshin Nail Munirovich
RU2792478C1
METHOD FOR DEVELOPMENT OF HIGH-VISCOSITY OIL OR BITUMEN RESERVES WITH HEAT EXPOSURE 2017
  • Zaripov Azat Timeryanovich
  • Shajkhutdinov Damir Kamilevich
  • Khafizov Ruslan Ildarovich
RU2673498C1
METHOD FOR DEVELOPING HIGH-VISCOSITY OR BITUMINOUS OIL DEPOSITS USING PAIRED HORIZONTAL WELLS 2022
  • Akhmetshin Nail Munirovich
RU2779868C1
METHOD FOR DEVELOPMENT OF HIGH-VISCOUS OIL DEPOSITS OR BITUMENS AT THERMAL EFFECT 2012
  • Bakirov Il'Shat Mukhametovich
  • Zaripov Azat Timer'Janovich
  • Idijatullina Zarina Salavatovna
  • Arzamastsev Aleksandr Ivanovich
  • Shajkhutdinov Damir Kamilevich
RU2527051C1
DEVELOPMENT METHOD OF HIGH VISCOUS OIL OR BITUMEN DEPOSIT 2019
  • Zakharov Yaroslav Vitalevich
RU2706154C1
METHOD FOR DEVELOPMENT OF DEPOSITS OF HIGH-VISCOSITY OIL OR BITUMEN 2021
  • Amerkhanov Marat Inkilapovich
  • Asliamov Niiaz Anisovich
  • Garifullin Marat Zufarovich
RU2758636C1
METHOD FOR DEVELOPMENT OF HIGHLY VISCOUS OIL POOL UNDERLAID BY WATER 2008
  • Abdulmazitov Rafil' Ginijatullovich
  • Nizaev Ramil' Khabutdinovich
  • Aleksandrov Georgij Vladimirovich
  • Fajzullin Il'Fat Nagimovich
  • Sajfutdinov Marat Akhmetzievich
  • Kuznetsov Aleksandr Nikolaevich
RU2365748C1
METHOD OF BITUMEN FIELD DEVELOPMENT 2016
  • Zaripov Azat Timeryanovich
  • Zakharov Yaroslav Vitalevich
  • Shajkhutdinov Damir Kamilevich
RU2623407C1

RU 2 794 686 C1

Authors

Amerkhanov Marat Inkilapovich

Akhmetzianov Fanil Muktasimovich

Akhmetshin Nail Munirovich

Dates

2023-04-24Published

2022-08-29Filed