FIELD: oil and gas industry.
SUBSTANCE: technology for eliminating brine manifestations. The method of drilling wells with active brine manifestations includes drilling to the roof of the brine-bearing formation, running and cementing the casing, pressure testing of the casing, opening and drilling of the brine-bearing formation. A pre-prepared cross-linking solution is pumped into the well, the well is kept under pressure for a period of time to prevent the drill string from sticking, an impenetrable screen is formed in the brine=bearing formation as a result of sedimentation after the chemical interaction of the cross-linking solution with formation water in the brine-bearing zone, and monitoring of success of operations to ensure circulation in the well when mud pumps are not working is carried out. In this case, opening and drilling is carried out with back pressure. Backpressure is created and controlled by gradually closing the annular space at the wellhead using the ram preventer's hand wheels. The amount of back pressure is regulated by the degree of overlap of the annular space. In case of excessive intensity of brine manifestation, back pressure is increased. Once an impenetrable screen has formed, back pressure is reduced.
EFFECT: improved reliability of isolation of fractured pressure strata.
1 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CREATING SCREENING CURTAIN WHEN DRILLING HIGH-PRESSURE STRATA SATURATED WITH STRONG CHLORIDE-CALCIUM BRINES | 2020 |
|
RU2735508C1 |
METHOD FOR OPENING HIGH-PRESSURE FORMATIONS SATURATED WITH STRONG BRINES | 2020 |
|
RU2735504C1 |
METHOD FOR RAPID ISOLATION OF ABSORBING ZONE IN WELL WITH HIGH-FLOW INTER-COMPARTMENT FLOW FROM SUPERHIGH STRATUM SATURATED WITH STRONG BRINES, AND PACKER EQUIPMENT FOR IMPLEMENTATION THEREOF | 2020 |
|
RU2741978C1 |
METHOD FOR SIMULTANEOUS PRODUCTION OF FLUIDS PRONE TO TEMPERATURE PHASE TRANSITION | 2020 |
|
RU2740884C1 |
METHOD FOR CONTROLLING SALINE WATER SEEPAGE IN WELL DRILLING | 0 |
|
SU977707A1 |
METHOD FOR WELL CONSTRUCTION IN COMPLICATED CONDITIONS | 2016 |
|
RU2630519C1 |
METHOD FOR DETECTING HIGH-RATE OBJECTS OF BRINE- AND GAS-BEARING STRUCTURES WITH ABNORMALLY HIGH FORMATION PRESSURE OF FLUIDS FOUNTAIN-HAZARDOUS FOR DRILLING WELLS | 2017 |
|
RU2653959C1 |
METHOD OF DRILLING FORMATIONS WITH ABNORMALLY HIGH FORMATION PRESSURE AND PREVENTING COLLAPSED WELL CASING STRING DURING OPERATION THEREOF | 2018 |
|
RU2732424C2 |
METHOD OF ISOLATING BRINE INFLOW INTO WELL | 0 |
|
SU1444505A1 |
METHOD FOR WELL CONSTRUCTION | 2011 |
|
RU2459922C1 |
Authors
Dates
2024-01-12—Published
2023-04-14—Filed