FIELD: gas industry.
SUBSTANCE: invention relates to an integrated hydrocarbon gas treatment plant, including a control valve, an inlet separator, adsorbers, the first and the second recuperative heat exchangers, a filter separator, filter devices, a propane refrigerator, a furnace, a high-pressure separator, a medium-pressure separator, a low-pressure separator, a process compressor. In this case, the integrated hydrocarbon gas treatment plant contains a recuperative intermediate heater, which, on the one side, is connected to the gas condensate outlet line from the medium pressure separator and to the saturated regeneration gas outlet line, and, on the other side, is connected, via the gas condensate outlet line, to the low-pressure separator and, via the line of the cooled part of the saturated regeneration gas, to the saturated regeneration gas line between the first recuperative heat exchanger and the propane refrigerator.
EFFECT: reduction in operating costs when heating gas condensate.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
NATURAL GAS ADSORPTION DRYING AND STRIPPING UNIT | 2022 |
|
RU2803501C1 |
ADSORPTION PLANT FOR THE PREPARATION AND TRANSPORTATION OF HYDROCARBON GAS | 2021 |
|
RU2786012C1 |
ADSORPTION INSTALLATION FOR NATURAL GAS PREPARATION AND TRANSPORTATION | 2021 |
|
RU2791272C1 |
INTEGRATED NATURAL GAS TREATMENT PLANT | 2022 |
|
RU2813543C2 |
ADSORPTION UNIT FOR PREPARING NATURAL GAS FOR TRANSPORT | 2020 |
|
RU2750699C1 |
ADSORPTION UNIT FOR PREPARATION OF NATURAL GAS | 2020 |
|
RU2750696C1 |
UNIT FOR PREPARING HYDROCARBON GAS FOR TRANSPORT | 2020 |
|
RU2769867C1 |
NATURAL GAS TREATMENT PLANT | 2021 |
|
RU2765821C1 |
INSTALLATION FOR THE PREPARATION OF HYDROCARBON GAS | 2021 |
|
RU2762392C1 |
UNIT FOR PREPARING NATURAL GAS FOR TRANSPORT | 2020 |
|
RU2766594C1 |
Authors
Dates
2024-02-13—Published
2022-08-10—Filed