FIELD: oil and gas industry.
SUBSTANCE: in the method of increasing oil recovery in sections of non-stationary water flooding, sections are selected for non-stationary water flooding with an compartmentalization factor of 1.5 and more, permeability of not less than 0.001 mcm2, oil viscosity up to 300 mPa⋅with, as well as the average value of water cut for all production wells in the area of not more than 98% and exceeding the depletion index of the recoverable reserves in the area, with the section development system — intra-contour waterflooding, type of injected water — fresh, waste and mineralized water with density of up to 1.18 g/cm3, containing weighted average solid-weighted particles up to 50 mg/dm3, oil products up to 60 mg/dm3, wherein all wells of the area — injection and production — represent a single hydrodynamic system. Results of geophysical investigations are used to determine duration of decreasing injectivity of the least permeable formation by 40%. Then, duration of half-cycles of cyclic mode of water injection and shutdown of injection wells after each half-cycle for depression-repression action on formations is determined as follows: with reduction of formation injectivity by 40% for 1–5 days, performing a semi-cycle of cyclic water injection for 5 days with depression-repression effects between semi-cycles of cyclic water injection in amount of 6 pieces, with reduction of formation injectivity by 40% for 6–15 days — for 12 days with depression-repression effects between semi-cycles of cyclic water injection mode in amount of 5 pcs, with reduction of formation injectivity by 40% for 16–30 days — for 22 days with depression-repression effects between semi-cycles of cyclic water injection mode in amount of 3 pcs, at reduction of formation injectivity by 40% for 31 and more days — during 30 days with depression-repression effects between semi-cycles of cyclic mode of water injection in amount of 3 pcs. Depression-repression action on formations is carried out after a half-cycle of water injection into the well immediately after its shutdown.
EFFECT: increasing oil recovery of the developed section due to prevention of colmatation of low-permeability interlayers, maintaining the profile of injectivity and oil displacement.
1 cl, 1 tbl, 2 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL POOL | 1996 |
|
RU2121060C1 |
DEVELOPMENT METHOD OF NON-HOMOGENEOUS OIL DEPOSIT | 2011 |
|
RU2471971C1 |
METHOD OF DROWNED OIL POOL DEVELOPMENT AT LATE STAGE | 2001 |
|
RU2197604C2 |
METHOD FOR OIL DEPOSIT DEVELOPMENT BASED ON SYSTEM ADDRESS ACTION | 2012 |
|
RU2513787C1 |
METHOD OF INCREASING OIL RECOVERY OF FORMATIONS | 2024 |
|
RU2820950C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSIT | 1995 |
|
RU2087686C1 |
METHOD OF DEVELOPMENT OF OIL FORMATION | 1999 |
|
RU2158360C1 |
OIL DEPOSIT DEVELOPMENT METHOD | 2012 |
|
RU2526922C2 |
OIL-AND-GAS POOL DEVELOPMENT METHOD | 2005 |
|
RU2287052C1 |
METHOD FOR DEVELOPING OIL DEPOSIT ON UNSTEADY CYCLIC PUMPING MODE AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2672365C1 |
Authors
Dates
2024-04-22—Published
2023-07-28—Filed