FIELD: construction.
SUBSTANCE: invention relates to the field of construction, in particular to methods of piling. Method of pile erection includes immersion of pile shaft into soil with simultaneous supply of solution into cavity between pile and soil. Cavity is filled with water or clay solution during pile immersion in subsidence soils, rubber concrete – in heaving, permafrost soils and soils with intensity of seismic impact of more than 6 points according to maps "A" and "B" of set of maps OSR-2015. Size of the cavity is controlled by the size of the expander and its position on the pile shaft depending on the performed function and soil conditions and is determined by formulas: subsidence soils – be=0.02–0.03 m, he=hsl; heaving and permafrost soils – be=0.02–0.03 m, he=(dƒ+1), m; soils of areas with intensity of seismic impact of more than 6 points according to maps A and B of set of maps OSR-2015 – be=0.04–0.16 m, he=3/α∈, m, where: be is width of broadening, m; he is the depth at which the expander is installed from the planning marks, m; hsl is the design depth to which the lateral friction forces of the subsiding soil layers are summed, taken equal to the depth of the subsiding thickness; dƒ – thickness of freezing-thawing layer, m; α∈ – coefficient of proportionality.
EFFECT: increasing bearing capacity and durability of piles.
1 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DETERMINING BEARING CAPACITY OF PILES IN SUBSIDING SOILS | 2015 |
|
RU2599894C2 |
METHOD OF BORED PILE ARRANGEMENT AND HOLE OPENING DEVICE FOR IT | 2008 |
|
RU2377366C1 |
METHOD FOR ERECTION OF BORED PILE | 2007 |
|
RU2364683C2 |
METHOD OF ERECTION OF ARMCO PILE-INJECTOR | 2006 |
|
RU2332540C2 |
WATER PIPE ARRANGED UNDER EMBANKMENT | 1997 |
|
RU2128264C1 |
PILE | 0 |
|
SU1806246A3 |
METHOD FOR ERECTION OF PILES FOUNDATION ON SAGGED GROUNDS | 2000 |
|
RU2184188C2 |
EARTHWORK ON PERMAFROST SOILS AND METHOD OF ITS ERECTION WITH BASE REINFORCEMENT IN AREAS OF PERMAFROST PROPAGATION | 2010 |
|
RU2443828C1 |
PILE IN THE PUNCHED WELL ARRANGEMENT METHOD (EMBODIMENTS) | 2017 |
|
RU2663420C1 |
METHOD TO ERECT PILE IN SEASONALLY FREEZING HEAVING SOILS | 2011 |
|
RU2474652C1 |
Authors
Dates
2024-05-22—Published
2023-11-21—Filed