FIELD: railway automation and telemechanics.
SUBSTANCE: in the railway transport floor object monitoring and control method, before the start of operation, the post transceiver and the post connection device are connected to the three-phase main supply line and to the three-phase backup supply line on the side of the control post device, and on the side of the floor railway transport facility – a local connection device and a local transceiver. During operation, remote signalling signals and remote control orders are transmitted using a three-phase main supply line and a three-phase backup line.
EFFECT: increased reliability of monitoring and control of floor objects of railway automation and telemechanics systems.
2 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
SYSTEM TO CONTROL TRAIN TRAFFIC | 2008 |
|
RU2388637C1 |
HUMP YARD AUTOMATIC CAB SIGNALING SYSTEM WITH RADIO CHANNEL | 2005 |
|
RU2303542C1 |
RAILWAY ACCIDENT PREVENTION SYSTEM | 2009 |
|
RU2392149C1 |
SYSTEM FOR INTERVAL REGULATION OF TRAIN TRAFFIC | 2021 |
|
RU2753990C1 |
SYSTEM FOR INTERVAL CONTROL OF MOVEMENT OF TRAINS AT RAILWAY HAUL | 2012 |
|
RU2513883C1 |
SYSTEM TO PREVENT COLLISION OF TRAIN OR LOCOMOTIVE WITH ARRIVING OR DEPARTING TRAIN | 2004 |
|
RU2288856C2 |
TRAIN CONTROL METHOD | 2019 |
|
RU2714824C1 |
MOBILE COMPLEX MICROPROCESSOR CONTROL SYSTEM OF ARROWS AND LIGHTS OF RAILWAY SITE | 2016 |
|
RU2622522C1 |
STATION RAILWAY TRAFFIC CONTROL DEVICE | 2012 |
|
RU2492090C1 |
MICROPROCESSOR SWITCHING SYSTEM | 2017 |
|
RU2648488C1 |
Authors
Dates
2024-10-30—Published
2024-03-21—Filed