FIELD: obtaining oil from wells.
SUBSTANCE: invention relates to oil production and can be used in bottomhole formation zone (hereinafter BFZ) or wells (injection, production) for stimulation of fluid inflow to the well bottom, namely: to create secondary fracturing of the formation. To implement the method of electrohydraulic impact on the oil formation, an electrohydraulic pulse device connected to a ground power supply is placed in the well in the zone of impact on the formation. Device contains electrically interconnected: a charging device, two units of storage capacitors, a discharge unit equipped with electrodes, a pressure sensor, a controller and a switch connected to a power supply by a key. Storage capacitor units are charged to the required voltage value. First unit of storage capacitors in the discharge gap is discharged and pressure in the discharge gap is simultaneously measured using a controller. At the moment of arrival of the backward wave, the controller fixes the time and issues a command to the commutator to discharge the second unit of capacitors, simultaneously opening the key for charging the first unit of capacitors. When the required voltage is reached on the first unit of capacitors, the cycle is repeated.
EFFECT: increase of energy delivered to pores of BFZ, with further increase of efficiency of action on oil-bearing formation due to simultaneous (in-phase) action of direct and reflected waves.
1 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ELECTRIC HYDRAULIC IMPACT ON OIL FORMATION AND DEVICE FOR ITS IMPLEMENTATION | 2009 |
|
RU2388908C1 |
METHOD FOR PRODUCTION OF OIL WITH HELP OF ELASTIC VIBRATION ENERGY AND FACILITY FOR ITS IMPLEMENTATION | 2009 |
|
RU2392422C1 |
METHOD FOR REMOTE CONTROL OF WELL ELECTRIC DISCHARGE DEVICES | 2008 |
|
RU2382373C1 |
BOREHOLE SOURCE OF ELASTIC VIBRATIONS | 2003 |
|
RU2248591C2 |
CHARGING DEVICE FOR CAPACITANCE STORAGE | 1997 |
|
RU2132105C1 |
ELECTROHYDRAULIC COMPLEX WITH PLASMA SPARK GAP | 2016 |
|
RU2621459C1 |
METHOD AND FOR ULTRASONIC INTENSIFICATION OF OIL PRODUCTION AND DEVICE FOR ITS IMPLEMENTATION | 2016 |
|
RU2630012C1 |
METHOD TO PRODUCE RARE METALS USING TECHNOLOGY OF DRILLHOLE IN SITU LEACHING AND DEVICE FOR ITS REALISATION | 2011 |
|
RU2478780C1 |
PRODUCTION SIMULATION METHOD IN OIL WELLS AND DEVICE FOR ITS IMPLEMENTATION | 2012 |
|
RU2520672C2 |
BENCH FOR ELECTRIC, THERMAL AND BARO TESTING OF DOWNHOLE DEVICES UNITS | 2010 |
|
RU2436059C1 |
Authors
Dates
2025-03-24—Published
2024-04-03—Filed