FIELD: mining.
SUBSTANCE: invention relates to the oil industry, to methods for development in a heterogeneous terrigenous reservoir. This method includes drilling of the section of the deposit, pumping of displacement agent, and production from production wells. When the production well is flooded to 98%, two side horizontal shafts are drilled with an opposite direction to each other with a length of at least 250 m in the horizontal part and a branch from the main vertical shaft of not less than 100 m and parallel to the non-reservoir propagation line, vertical production well and its offshoots are developed for injection, in zone of non-reservoir zones gap horizontal production well is drilled with length of horizontal part of not more than 150 m against injection well with side horizontal shafts in less permeable interlayer and not less than 1.5 m from deposit bottom. Displacement is performed by pumping of displacement agent through branched horizontal sidetrack in cyclic mode: during injection into the vertical shaft of the injection well for 3 days, the horizontal one – in downtime, then in case of injection into side horizontal shafts for 7 days, the vertical one – in downtime.
EFFECT: present method will allow to increase oil recovery of the deposit.
1 cl, 1 dwg, 1 ex
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF SECTION OF OIL RESERVOIR WITH HETEROGENEOUS RESERVOIR (VERSIONS) | 2024 |
|
RU2833660C1 |
METHOD FOR DEVELOPMENT OF SECTION OF OIL RESERVOIR WITH NON-RESERVOIR DEVELOPMENT ZONES | 2025 |
|
RU2841035C1 |
METHOD FOR DEVELOPMENT OF OIL FIELD WITH HETEROGENEOUS RESERVOIRS | 2023 |
|
RU2819865C1 |
METHOD TO DEVELOP SMALL DEPOSITS AND SEPARATE LENSES OF OIL DEPOSIT | 2011 |
|
RU2447271C1 |
DEVELOPMENT METHOD OF MULTILAYER NON-HOMOGENEOUS OIL DEPOSIT | 2014 |
|
RU2567918C1 |
METHOD OF DEVELOPING OIL DEPOSITS | 2015 |
|
RU2580562C1 |
METHOD OF DEVELOPMENT OF OIL POOLS OBSTRUCTED BY EROSION TRENCH | 2007 |
|
RU2334087C1 |
METHOD FOR DEVELOPMENT OF OIL DEPOSITS COMPLICATED WITH VISEAN EROSIONAL DOWNCUTS | 2005 |
|
RU2298087C1 |
PROCEDURE FOR DEVELOPMENT OF OIL DEPOSIT COMPLICATED WITH VERTICAL RUPTURE | 2010 |
|
RU2431740C1 |
METHOD FOR DEVELOPMENT OF MULTI-FORMATION OIL DEPOSITS WITH CIRCULAR PRODUCTION WELL IN MIDDLE OF ELEMENT AND HORIZONTAL INJECTION WELLS | 2024 |
|
RU2839493C1 |
Authors
Dates
2025-04-28—Published
2024-07-10—Filed