FIELD: obtaining oil and gas from wells.
SUBSTANCE: invention relates to oil and gas industry and can be used for maintenance of formation pressure for controlled injection of fluid into injection wells. Device for controlled injection of liquid into injection well includes injection well with wellhead shutoff valve, supply pipeline with shutoff-bypass device equipped with shutoff element and drive connected to shutoff element via reduction gear and receiving signals from control station. Shutoff element is made with a predetermined number of longitudinal through holes and with a predetermined diameter of said through holes, configured to supply a liquid working agent to the injection well at the moment of opening the corresponding through hole, after moving in process of working agent pumping from one through hole to another. Shutoff element is made in form of drum with through holes arranged along circumference uniformly relative to axis of rotation of drum. Drive is made in the form of a stepper motor rotating in one direction and providing, by means of a reduction gear, sequential opening of through holes in response to a signal from a control station.
EFFECT: proposed device allows to simplify the design of the shutoff element-drum and the drive due to the uniform placement of the through holes around the circumference relative to the drum axis and rotation of the drive only in one direction without reversal with the same step for each signal from the control station.
2 cl, 5 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL AND GAS DEPOSIT BY MAINTAINING FORMATION PRESSURE AT STEADY-STATE CONSTANT INJECTION MODE AND EQUIPMENT FOR ITS IMPLEMENTATION | 2020 |
|
RU2735011C1 |
METHOD FOR DEVELOPING OIL DEPOSIT ON UNSTEADY CYCLIC PUMPING MODE AND DEVICE FOR ITS IMPLEMENTATION | 2017 |
|
RU2672365C1 |
INJECTION WELL | 2015 |
|
RU2574641C2 |
PROGRAM-CONTROLLED INJECTION WELL | 2015 |
|
RU2578078C2 |
METHOD OF INJECTION OF WATER IN THE SYSTEM OF SUPPORTING THE RESERVOIR PRESSURE IN WEAKLY PERMEABLE HEADERS | 2018 |
|
RU2676780C1 |
METHOD OF INFLUENCE ON STAGNANT ZONE OF INTERVALS OF STRATA OF GARIPOV AND PLANT FOR ITS IMPLEMENTATION | 2012 |
|
RU2529072C2 |
SYSTEM TO PUMP WATER AND CLEAN BOTTOMHOLE FORMATION ZONE OF INJECTION WELL | 2010 |
|
RU2450120C1 |
METHOD FOR INDIVIDUAL TREATMENT OF PUMPED FLUID FOR CLEANING BOTTOMHOLE FORMATION ZONE OF INJECTION WELL | 2014 |
|
RU2584426C2 |
DEVICE FOR DUAL INJECTION OPERATION OF AGENT IN WELL FORMATIONS (VARIANTS) | 2016 |
|
RU2626485C2 |
METHOD OF GARIPOV'S WELL OPERATION AND DEVICE FOR ITS REALISATION (VERSIONS) | 2008 |
|
RU2398100C2 |
Authors
Dates
2025-05-27—Published
2024-11-15—Filed