FIELD: mining. SUBSTANCE: at the beginning of development under the natural water drive conditions, product is withdrawn over entire section without injection of water into injection wells. After flooding of highly permeable reservoirs in formation bottom part equalling in thickness 0.2-0.3 of initial oil-saturated thickness, water is injected within limits of oil reservoir to formation bottom part, and beyond the contour zone, over the entire section. Formation fluids are wirhdrawn through producing wells perforated only in formation roof part. EFFECT: reduced water cutting of well production and increased oil recovery at reduced expenditures for water injections. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR WATERED OIL POOL DEVELOPMENT | 2006 |
|
RU2318993C1 |
METHOD FOR DEVELOPING OIL DEPOSIT WITH GAS CAP | 2006 |
|
RU2327861C2 |
METHOD OF DEVELOPING DEPOSITS OF COMBINED OCCURRENCE OF OIL AND HYDROMINERAL MATERIALS | 1999 |
|
RU2148159C1 |
DEVELOPMENT METHOD OF OIL FRINGE IN CARBONATE RESERVOIR OF COMPLEX STRUCTURE | 2012 |
|
RU2509878C1 |
METHOD OF OIL POOL DEVELOPMENT | 2002 |
|
RU2209954C1 |
METHOD OF OIL POOL DEVELOPMENT AT LATE STAGE | 2000 |
|
RU2178517C2 |
METHOD OF EXPLOITING GEOLOGIC HETEROGENEOUS OIL POOLS | 1983 |
|
SU1147084A1 |
METHOD OF DEVELOPING OIL RESERVOIR FEATURING BOTTOM WATER AND LOW PERMEABILITY AT THE ROOF | 0 |
|
SU1719621A1 |
METHOD FOR DEVELOPMENT OF OIL POOL WITH BOTTOM WATER | 1999 |
|
RU2151860C1 |
METHOD OF DEVELOPING MULTIHORIZON OIL DEPOSIT WITH LARGE NUMBER OF WELLS AND WITH PROLONGED TERM OF OPERATION | 2001 |
|
RU2191893C1 |
Authors
Dates
1995-08-09—Published
1985-11-10—Filed