FIELD: mining industry. SUBSTANCE: method includes injection of water through injection wells and formation fluids are withdrawn through producing wells. Production of hydromineral materials is accomplished with maximum rate from wells located beyond the oil outline and perforated over entire formation thickness. Injection of used water is accomplished into oil-bearing interval of the same horizon through injection or flooded oil wells in central part of deposit. EFFECT: reduced cost prize of oil and hydromineral materials production, reduced water cutting of products and prevented impoverishment of materials. 1 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ADDITIONAL DEVELOPMENT OF WATER-FLOODED SECTIONS OF GAS-CONDENSATE DEPOSIT OF OIL AND GAS CONDENSATE DEPOSIT | 2019 |
|
RU2744535C1 |
METHOD FOR DEVELOPMENT OF HYDROCARBONS WITH ASSOCIATED OCCURRENCE AND HYDROMINERAL RAW MATERIAL OF MULTILAYER FIELD | 2013 |
|
RU2523318C1 |
METHOD OF DEVELOPING OIL POOL UNDERLAID WITH WATER | 1998 |
|
RU2149984C1 |
OIL FIELD DEVELOPMENT METHOD | 2004 |
|
RU2277630C1 |
METHOD FOR INCREASING OIL RECOVERY | 2005 |
|
RU2291958C2 |
OIL DEPOSIT DEVELOPMENT METHOD | 2023 |
|
RU2819871C1 |
METHOD OF FLUID INJECTION INTO FORMATION | 2002 |
|
RU2211314C1 |
METHOD FOR RECOVERY OF RESIDUAL OIL RESERVES | 2012 |
|
RU2511151C2 |
PROCESS OF DEVELOPMENT OF OIL DEPOSIT | 2001 |
|
RU2199653C1 |
RESERVOIR MANAGEMENT TECHNIQUE | 2010 |
|
RU2441978C1 |
Authors
Dates
2000-04-27—Published
1999-11-22—Filed