FIELD: control of nuclear power reactors. SUBSTANCE: time analyzer channel width τo calculated beforehand and depending on τo is set, dependence of number of pulses on neutron sensor within time space Δt is calculated within time interval Δt depending on Δt and calculated beforehand is measured; calculations are made using equations based on method of least directed disagreement in reactor acceleration period value. EFFECT: low-error identification of desired reactor acceleration period τo in real-time conditions. 3 dwg
Authors
Dates
1994-02-28—Published
1989-04-03—Filed