FIELD: civil engineering. SUBSTANCE: ground bed for road and pipelines breaking in permafrost area has main road embankment, additional embankment adjoining to that with pipelines and thermal insulating shield located in that. The shield is placed between the main and additional embankments and below foot of the ground bed. EFFECT: increased operation reliability of the road at the expense of elimination of warning up permafrost soil in road base. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
HEAT-SHIELDING SET FOR UNDERGROUND PIPELINE | 2008 |
|
RU2346199C1 |
ROAD EMBANKMENT BERM | 2003 |
|
RU2246587C1 |
EMBANKMENT ON TERRAIN SECTIONS WITH CROSS SLOPE AND HEAVILY ICY PERMAFROST SOILS | 0 |
|
SU1807173A1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256032C1 |
MOTOR ROAD AT PERMAFROST GROUNDS | 2019 |
|
RU2732774C1 |
METHOD FOR DRIVING A GAS MAIN IN MAN-MADE TRENCH AT PERMAFROST SOIL TERRITORY (VARIANTS) AND DEVICE FOR REALIZATION OF METHOD (VARIANTS) | 2006 |
|
RU2303736C1 |
METHOD OF LAYING ABOVE-GROUND PIPELINES ALONG MOTOR ROAD IN PERMAFROST areas | 1985 |
|
SU1295855A1 |
METHOD FOR CONSTRUCTING SUBGRADE OF ADDITIONAL TRACK ON WEAK BASE IN CASE OF THAWING | 2021 |
|
RU2795020C1 |
BRIDGE-TYPE PASSING ON PERMAFROST | 1993 |
|
RU2039146C1 |
ROAD EMBANKMENT BUILT ON PERMAFROST GROUND | 2004 |
|
RU2256031C1 |
Authors
Dates
1995-09-20—Published
1988-12-14—Filed