FIELD: environment control. SUBSTANCE: rock near nuclear power plant is broken out; to this end vertical shaft is sunk and from this shaft top fan heading and bottom haulage heading are drifted; chamber is made between them. Reactor is let down into chamber in the course of extraction of loose shrinking rock, reactor being supported by this rock. Shrinking rock is extracted to bottom haulage heading through cross-cuts equipped with vibrating feeders affording smooth adjustable extraction of loose shrinking rock. EFFECT: improved reliability of reactor burial. 5 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPING LOW-POWERED STEEL ORE BODIES | 2021 |
|
RU2757619C1 |
METHOD FOR DEVELOPMENT OF STEEP ORE BODIES | 1996 |
|
RU2117761C1 |
METHOD OF WORKING INTERCHAMBER PILLAR | 1991 |
|
RU2010972C1 |
METHOD OF MINING STEEP ORE DEPOSITS | 0 |
|
SU1656096A1 |
METHOD OF MINING STEEP ORE BODIES | 0 |
|
SU1121438A1 |
DEVELOPMENT METHOD OF STEEPLY-DIPPING ORE BODIES | 2008 |
|
RU2386031C1 |
METHOD OF WORKING ORE LODES | 0 |
|
SU1518520A1 |
METHOD OF WORKING STEEPLY SLOPING MEDIUM-THICK ORE BODIES | 0 |
|
SU1078072A1 |
METHOD FOR EXTRACTION OF STEEPLY DIPPING ORE BODIES | 2003 |
|
RU2236591C1 |
METHOD OF DEVELOPMENT OF STEEP ORE | 2007 |
|
RU2352778C1 |
Authors
Dates
1994-02-28—Published
1990-10-31—Filed