FIELD: materials handling machinery. SUBSTANCE: load hanger has deflecting sheaves, equalizing sheaves and hook sheaves fixed on axle. Lifting wire rope passes over sheaves forming double pulley block. Equalizing sheaves and deflecting sheaves are installed on cross-members welded to crane boom. Planes of equalizing sheaves are parallel to plane of load cross swinging, and planes of sheaves are parallel to boom plane. EFFECT: enhanced suppression of swinging. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
CARGO BEAM SUSPENSION | 2010 |
|
RU2447009C1 |
HINGE-JOINTED JIB | 0 |
|
SU1344727A1 |
CARGO SUSPENSION FOR CRANE TROLLEY | 0 |
|
SU1546407A1 |
CARGO-HOISTING DEVICE | 0 |
|
SU1370050A1 |
0 |
|
SU424803A1 | |
HOOK ASSEMBLY | 1990 |
|
RU2025445C1 |
CARGO OSCILLATION DAMPER ON SHIP CRANE JIB | 2021 |
|
RU2769024C1 |
CARGO PULLEY BLOCK | 0 |
|
SU1789501A1 |
TRUCK-MOUNTED HOIST | 1994 |
|
RU2097306C1 |
Authors
Dates
1994-01-30—Published
1990-04-26—Filed