FIELD: metallurgy, thermal power engineering. SUBSTANCE: installation is designed for burning of solid fuel and coke-free production of cast iron. Novelty of installation is connection of forehearth with uptake and with two or several reaction chambers of modular design by means of internal slag siphons. During operation one of chambers is disconnected due to technical necessity. Thanks to provision for continuous supply of gas into uptake and further on into boiler power installation stable thermal condition is created in the latter which leads to prolonged service life of installation. EFFECT: prolonged service life. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
FURNACE | 1995 |
|
RU2087820C1 |
METHOD OF MELTING MATERIALS IN MOLTEN-METAL BATH AND FURNACE FOR REALIZATION OF THIS METHOD | 1998 |
|
RU2152436C2 |
COMPLEX FOR REWORKING SOLID DOMESTIC AND INDUSTRIAL WASTES | 1997 |
|
RU2122155C1 |
FURNACE FOR PROCESSING MATERIALS IN LIQUID BATH | 1998 |
|
RU2140615C1 |
FURNACE | 1993 |
|
RU2044210C1 |
METHOD AND FURNACE FOR RECOVERING RADIOACTIVE WASTES | 2004 |
|
RU2282907C2 |
FURNACE | 1993 |
|
RU2061938C1 |
METHOD FOR PRODUCING STEEL, ELECTRICITY, AND PORTLAND CEMENT | 2021 |
|
RU2775976C1 |
METHOD AND FURNACE FOR PROCESSING RADIOACTIVE METAL WASTES | 1998 |
|
RU2148865C1 |
PROCESSING METHOD OF METALLURGICAL RAW MATERIALS AND DEVICE FOR SUCH METHOD IMPLEMENTATION | 2015 |
|
RU2611229C2 |
Authors
Dates
1994-02-15—Published
1991-06-17—Filed