FIELD: mechanization of good length pieces packing. SUBSTANCE: apparatus has a frame in upper part of which accepting sliding shelves are set. A mechanism of a row of sleepers feeding is brought near to the shelves. A lifting-lowering table is set under he accepting shelves. Sleepers butts levelling tools in the form of beams are mounted over the shelves. The beams have spring levers with angles of inclination to the beams are in series decreasing, beginning from the first lever to the last one. Beams and shelves are moved by hydraulic cylinders. Stoppers for first sliders are set on the accepting shelves. Stoppers are placed on the frame. Stoppers are engaged with levers. A conveyor is used for removal of formed sleepers bundles from the apparatus. EFFECT: apparatus is used for good length pieces bundles formation. 5 dwg
Title | Year | Author | Number |
---|---|---|---|
ROLLING TRAIN FOR THE DEEP PRICKING OUT OF CROSS TIES | 1991 |
|
RU2026174C1 |
TIE FEEDER OF TIE-PROCESSING LINE | 1992 |
|
RU2070245C1 |
PRODUCTION LINE FOR ASSEMBLY OF RAIL LENGTHS | 1993 |
|
RU2063493C1 |
APPARATUS TO PIN WOODEN SLEEPERS ON BEFORE IMPREGNATION | 1990 |
|
RU2019404C1 |
ROLLING TRAIN FOR THE DEEP PINNING ON THE SLEEPERS | 1991 |
|
RU2038962C1 |
SPIKE FINISH-DRIVING MACHINE | 1993 |
|
RU2063494C1 |
STAND FOR ASSEMBLY OF SWITCHES | 1991 |
|
RU2007507C1 |
FLOW LINE FOR DEEP PIERCING OF SLEEPERS | 0 |
|
SU1728012A1 |
0 |
|
SU1670024A1 | |
DEVICE FOR REMOVING HOOK BOLTS FROM REINFORCED CONCRETE TIES | 1991 |
|
RU2010078C1 |
Authors
Dates
1994-03-30—Published
1991-04-30—Filed