FIELD: rail track maintenance and repair. SUBSTANCE: device has gantry frame 1 which embraces ties 2. Fitted on frame 1 by means of hangers in form of columns 11 are mechanisms 8 for gripping, turning and extracting hook bolts 9 and mechanisms 10 for cleaning tie seats for bolts 9. One mechanism 8 and one mechanism 10 are installed on one column 11 for turning in horizontal plane. Mechanism 10 has fork-type cleaning tool 16 connected with pulse-impact drive 17. Mechanisms 8 and 10 are placed in turn over corresponding hook bolt. Mechanism 10 breaks consolidated layer of dirt in tie seat zones, and mechanism 8 extracts bolt 9 from tie 2. EFFECT: enlarged operating capabilities. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
APPARATUS FOR SCREWING ON AND OFF FASTENING MEMBERS OF INTERMEDIATE RAIL FIXATION | 1992 |
|
RU2043451C1 |
CYCLIC-ACTION MACHINE FOR OPERATIONG WITH INTERMEDIATE RAIL FASTENING OF RAIL TRACK | 1992 |
|
RU2040624C1 |
DEVICE FOR SEPARATING RAILS FROM TRACK SKELETON | 1999 |
|
RU2167971C2 |
TRACK RAILS ENJOINING DEVICE | 1999 |
|
RU2180027C2 |
METHOD OF AND DEVICE FOR FASTENING RAIL TO TIE BASEPLATES | 2001 |
|
RU2216625C2 |
CONTINUOUS LINE FOR REPAIR OF TRACK SKELETON LINKS | 2001 |
|
RU2210654C2 |
RAILWAY TRACK SKELETON DISASSEMBLING DEVICE | 1998 |
|
RU2154708C2 |
APPARATUS FOR UNSCREWING OF NUTS OF EMBEDDED BOLTS OF TRACK RAIL-SLEEPER LATTICE | 0 |
|
SU1081256A1 |
DEVICE TO PREVENT CRACKING OF TIES | 2003 |
|
RU2239686C1 |
DEVICE TO PREVENT CRACKING OF TIES | 2003 |
|
RU2249646C1 |
Authors
Dates
1994-03-30—Published
1991-11-15—Filed