FIELD: mining industry. SUBSTANCE: method for shaft sinking in water-bearing horizons consists in drilling of unwatering holes above under ground workings, installation in holes of casing and filtering pipes, formation in holes of gravel filters and withdrawal of casing pipes with subsequent sinking of shaft. Method is distinguished by the fact that unwatering holes are arranged in mine shaft section. Filtering pipes are made of easily disintegrating material, and gravel filter is formed in hollow of filtering pipes. EFFECT: higher efficiency. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF COMBINED MINING OF FLOODED MINERAL DEPOSITS | 1999 |
|
RU2165018C2 |
METHOD FOR CONSTRUCTION OF MINE SHAFTS IN WATERED UNSTABLE ROCKS | 1990 |
|
RU2095574C1 |
METHOD FOR COMBINED MINING OF DEEP-SEATED DEPOSITS WITH ROCKS OF DIFFERENT HARDNESS | 1992 |
|
RU2021513C1 |
METHOD OF CONSTRUCTING MINE SHAFT IN SOFT FLOODED STRATA | 0 |
|
SU640033A1 |
METHOD OF EQUIPPING WELL WITH FILTER IN UNSTABLE ROCKS | 0 |
|
SU1694867A1 |
METHOD FOR DRIVING TUNNELS IN UNSTABLE WATER-SATURATED ROCKS | 1992 |
|
RU2043501C1 |
METHOD OF CONSTRUCTING UTILITY WELLS | 0 |
|
SU891894A1 |
METHOD FOR DEGASSING OF COAL BEDS | 2008 |
|
RU2383741C1 |
METHOD OF INCLINED MINE WELLHEAD CONSTRUCTION IN DEPOSITIONS | 2008 |
|
RU2376419C1 |
METHOD FOR CONSTRUCTING HORIZONTAL OR SLANTING DRAINING WELL IN WATERED SAND HORIZONS, DEVICE FOR REALIZATION OF SAID METHOD, FILTER PIPE | 2002 |
|
RU2233373C1 |
Authors
Dates
1994-04-30—Published
1991-11-26—Filed