FIELD: mining. SUBSTANCE: method includes determination of contours of loose ore deposits and ore deposits composed of hard ores. Holes are drilled into loose ore deposits down to their lower boundary. Bed is mined by layers. Pulp is formed hydraulically and raised to the surface. After hydraulic borehole mining, vertical or inclined shaft in side rocks is sunk by means of at least one horizontal or inclined exposing working from shaft to ore body. Ore deposits comprised of hard ores are mined layer by layer from top downward with filling worked-out space. EFFECT: higher efficiency. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF MINERAL DEPOSITS | 1992 |
|
RU2049234C1 |
METHOD FOR COMBINATION MINING OF MINERAL DEPOSIT | 1992 |
|
RU2036308C1 |
METHOD FOR EXTRACTING FORMATIONS OF MINERAL RESOURCES | 2005 |
|
RU2295039C1 |
METHOD OF GEOTECHNOLOGICAL DIFFERENTIAL OF ORES AT PROSPECTING FOR UNDERGROUND LEACHING | 1995 |
|
RU2092689C1 |
METHOD OF DEVELOPMENT OF LOOSE ORES OF DEEP SEATED DEPOSITS | 2007 |
|
RU2343283C1 |
METHOD OF SEARCH FOR ORE DEPOSITS IN TERRIGENIC ROCKS | 1998 |
|
RU2136024C1 |
METHOD FOR DEVELOPING DEEP-SEATED MINERAL DEPOSITS | 2002 |
|
RU2235206C1 |
INCREASING SOLID MINERAL WEALTH DEPOSIT (SMD) WORKING EFFICIENCY | 2014 |
|
RU2575192C2 |
METHOD FOR HOLE HYDRAULIC MINING OF MINERALS FROM DEEPLY SEATED DEPOSITS | 0 |
|
SU1810549A1 |
METHOD FOR BORE-HOLE EXTRACTION OF USEFUL MINERALS | 1995 |
|
RU2086768C1 |
Authors
Dates
1994-10-15—Published
1992-03-27—Filed