FIELD: mining. SUBSTANCE: provides for increased intervals between relief holes as advancing towards axis of working. In this case longitudinal axis of interholechain pillar of maximum width is oriented in same vertical plane with longitudinal axis of development working. Holes are drilled on both sides of longitudinal of development working successively, beginning from holes located on boundary of relief zone, and finishing with holes which outline interhole pillar of maximum width. EFFECT: reduced expenses for support of working. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF MINE FIELD IN MINING MINERAL BEDS AT LARGE DEPTHS | 1994 |
|
RU2069754C1 |
METHOD FOR SAVING SECTIONS OF DEVELOPMENT WORKINGS | 1998 |
|
RU2134786C1 |
METHOD FOR MINING MINERAL DEPOSITS AT LARGE DEPTH | 1991 |
|
RU2013548C1 |
PROCESS OF EXPLOITATION OF THICK GAS-BEARING GENTLY DIPPING SEAMS | 1993 |
|
RU2057934C1 |
METHOD AND CUTTER-LOADER MACHINE FOR DEVELOPMENT OF SEAM DEPOSITS OF MINERALS | 1996 |
|
RU2103507C1 |
METHOD OF GUARD OF DEVELOPMENT WORKINGS | 0 |
|
SU1716145A1 |
METHOD OF COVER CAVING | 1999 |
|
RU2163968C2 |
METHOD FOR PREPARATION OF DOUBLE FACES | 1994 |
|
RU2069753C1 |
METHOD OF MINING FLAT SEAMS PRONE TO HEAVING | 1999 |
|
RU2149999C1 |
METHOD OF PROTECTING DEVELOPMENT WORKINGS IN WINNING OF COAL SEAMS | 2001 |
|
RU2188949C1 |
Authors
Dates
1994-05-15—Published
1991-02-11—Filed