FIELD: mining industry. SUBSTANCE: workings of lower layer are displaced towards completed column and rubble strip is left under intercolumn pillar of same width after advance of breakage face along lower layer. EFFECT: enhanced safety of process. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF MINING THICK GASSY FLAT SEAMS (VERSIONS) | 1999 |
|
RU2150001C1 |
METHOD FOR PREPARATION OF EXTRACTION PORTIONS | 2003 |
|
RU2242610C1 |
METHOD OF LAYER MINING OF THICK FLAT COAL BED | 2012 |
|
RU2490458C1 |
METHOD FOR PROTECTION OF DEVELOPMENT DRIFTS IN DRIFT SLICING OF SALT BEDS | 2009 |
|
RU2400627C1 |
METHOD FOR SAVING SECTIONS OF DEVELOPMENT WORKINGS | 1998 |
|
RU2134786C1 |
METHOD OF EXPLOITATION OF THICK GENTLY SLOPING GAS-BEARING-STRATA | 0 |
|
SU566933A1 |
METHOD FOR PREPARATION OF DOUBLE FACES | 1994 |
|
RU2069753C1 |
METHOD OF MINING BEDS | 0 |
|
SU1716136A1 |
METHOD FOR UNDERGROUND DEVELOPMENT OF FLAT COAL BEDS PRONE TO SPONTANEOUS IGNITION | 2019 |
|
RU2726752C1 |
METHOD OF PROTECTING DEVELOPMENT WORKINGS IN WINNING OF COAL SEAMS | 2001 |
|
RU2188949C1 |
Authors
Dates
1996-04-10—Published
1993-02-01—Filed