FIELD: civil engineering. SUBSTANCE: soil is filled into the tray; the detectors are disposed in the soil and the soil is frozen through. Before to place detectors into the soil, their surfaces are covered with glue and layer of sand. Areas for placing detectors into the frozen soil are formed and the detectors are pressed against areas being preliminary smoothed and cleaned by melt soil. Then the soil is frozen again. EFFECT: improved reliability. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF ARRANGING A GROUNDWORK IN THE PERMAFROSTS | 1991 |
|
RU2034955C1 |
METHOD OF SINKING TUBULAR PILE INTO PERMAFROST GROUND | 1996 |
|
RU2109881C1 |
METHOD FOR CONSTRUCTION OF ANCHOR FASTENING | 1991 |
|
RU2014388C1 |
METHOD OF REINFORCEMENT OF DEEPENED BEARING STRUCTURE | 1991 |
|
RU2026449C1 |
METHOD FOR REINFORCING FOUNDATION BASE | 1991 |
|
RU2014392C1 |
METHOD FOR CONSTRUCTING FOUNDATION FOR BUILDINGS ON SUBSIDING GROUND | 1991 |
|
RU2014394C1 |
DRILL-HOLE HYDRAULIC GIANT FOR MAKING SLITS IN GROUND | 1991 |
|
RU2014455C1 |
0 |
|
SU1783077A1 | |
ARRANGEMENT FOR PROTECTING FOUNDATIONS AGAINST FROST-INDUCED SWELLING | 0 |
|
SU1530676A1 |
METHOD OF MAKING FILLING PILE IN FROZEN SOIL | 0 |
|
SU717225A1 |
Authors
Dates
1995-02-20—Published
1991-11-20—Filed