FIELD: shutoff of foreign water in wells. SUBSTANCE: method consists in running of tubing into flow string down to zone of shutoff. Isolating material is supplied through tubing and injected at pressure to casing string-borehole annulus. Injection is carried out at definite rate that ensures injection pressure at the level of shutoff zone. Pressure value of expected maximum depression in process of development or operation of well not less than by 3 MPa. Then, well is kept under pressure to let cement set. Pressure value during well keeping at pressure is maintained at level not less than difference between formation pressure and pressure in flow string. Time for keeping well under pressure is not less than time of beginning of setting of isolating material. In this case, this time is not higher than 2/3 of time of isolating material setting. EFFECT: higher quality of shutoff. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN PETROLEUM PRODUCTION BOREHOLES | 2021 |
|
RU2774251C1 |
METHOD FOR ELIMINATING FLOWS BEHIND THE CASING IN A PETROLEUM PRODUCTION BOREHOLE FROM AN UNDERLYING AQUIFER | 2021 |
|
RU2776018C1 |
ISOLATION METHOD FOR BOREHOLE ANNULUS CIRCULATION OF SUPERIOR NON PERFORATED AQUIFER IN DOWNSTREAM PERFORATED OIL-BEARING LAYER | 2015 |
|
RU2584256C1 |
METHOD OF PHYSICAL ABANDONMENT OF WELLS | 2014 |
|
RU2576422C1 |
METHOD OF CONDUCTING WATER-INSULATING WORKS IN THE EXTRACTING WELL, EXCLUDING THE WATER OIL DEPOSIT | 2017 |
|
RU2661935C1 |
CASING ANNULUS PLUGGING METHOD | 2005 |
|
RU2286438C1 |
WATER AND GAS INFLUX LIMITING METHOD WITH WELL PRODUCTIVITY RECOVERY | 2013 |
|
RU2539047C1 |
METHOD OF FORMATION ISOLATION WITH CEMENT-SILICATE MUD | 2012 |
|
RU2519262C1 |
METHOD OF SEGREGATION OF FORMATIONS IN WELL | 1999 |
|
RU2183265C2 |
METHOD OF REPAIR-INSULATION WORKS IN OIL AND GAS WELL | 2019 |
|
RU2723416C1 |
Authors
Dates
1994-06-30—Published
1991-12-11—Filed