FIELD: power plants. SUBSTANCE: at starting mode steam from steam accumulator is supplied into steam turbine till it gathers starting value of power. After this air and fuel are fed into combustion chamber. When steam turbine reaches rated condition feeding of steam into it is accomplished from evaporation section of waste-heat boiler with simultaneous supply of steam into steam accumulator. EFFECT: enhanced operational efficiency. 4 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
COMBINED STEAM-GAS POWER PLANT AND METHOD OF ITS OPERATION | 1990 |
|
RU2009333C1 |
GAS-TURBINE PLANT AND METHOD OF ITS OPERATION | 1994 |
|
RU2137935C1 |
GAS-TURBINE PLANT AND METHOD OF SPEEDING UP OF GAS TURBINE PLANT | 1993 |
|
RU2112887C1 |
GAS-TURBINE APPARATUS | 0 |
|
SU1834981A3 |
GAS DELIVERY RADIAL FLOW TURBINE | 1994 |
|
RU2125164C1 |
PROCESS OF REPLACEMENT OF INDIVIDUAL MACHINE AND DETACHABLE UNIT | 1995 |
|
RU2144642C1 |
PREMIX BURNER | 1994 |
|
RU2106573C1 |
ATOMIZER | 1990 |
|
RU2011117C1 |
HYDRAULIC SYSTEM FOR SUPPLYING STEAM TO STEAM TURBINE | 1991 |
|
RU2039297C1 |
COMBINED STEAM-AND-GAS TURBINE POWER STATION AND METHOD OF RECOVERY OF THERMAL ENERGY OF FUEL AT THIS STATION | 0 |
|
SU1838636A3 |
Authors
Dates
1994-06-30—Published
1991-01-30—Filed