FIELD: blasting. SUBSTANCE: drilled in broken mass are roes of holes along bench crest. Holes are charged with explosives provided with intermediate detonators. In holes located near bench crest the charge is distributed by sections. Each section is provided with separate intermediate detonator. Upper intermediate detonator is arranged higher than intermediate detonators in subsequent hole rows and at depth shorter than interval between hole rows. Charges are blasted by rows, beginning from those near bench crest. Firing intervals of each subsequent hole row are increased. EFFECT: higher efficiency. 2 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
EXPLOSIVE CHARGE INITIATION SYSTEM | 2005 |
|
RU2285897C1 |
METHOD OF WORKING DRIVING | 1996 |
|
RU2126133C1 |
METHOD FOR SHOOTING OF ORE FROM MASSIF WITH FLAKY TEXTURE | 2008 |
|
RU2379622C1 |
METHOD OF BREAKING UP BY EXPLOSIVES ORE FROM SOLID MASS WITH LAYERED TEXTURE | 2013 |
|
RU2532478C1 |
METHOD OF CONSTRUCTION OF HIGH BENCHES OF PIT FLANK | 1994 |
|
RU2076210C1 |
METHOD FOR CONDUCTING OF DRILLING AND BLASTING OPERATIONS | 2001 |
|
RU2184928C1 |
METHOD FOR EXPLOSIVE DESTRUCTION OF VARIOUS COHERENCE ROCK MASSIF WITH DISTRIBUTED AND SHORTENED BLASTHOLE CHARGES WITH CUMULATIVE EFFECT | 2015 |
|
RU2594236C1 |
METHOD FOR ROCK BLASTING | 2009 |
|
RU2410640C1 |
METHOD OF UNLOADING OF OUTBURST-PRONE ROCK MASS REGIONS BY BLASTING | 2001 |
|
RU2210671C2 |
METHOD OF CONDUCTING BLASTING OPERATIONS ON EXTENDED BLOCKS, TAKING INTO ACCOUNT THE PRE-DESTRUCTION ZONE | 2022 |
|
RU2791609C1 |
Authors
Dates
1994-08-15—Published
1991-05-28—Filed