FIELD: mining; methods of construction of stable benches. SUBSTANCE: bench is formed of two approximately equal subbenches at angle of slope about 50 deg. Safety area is formed in zone of seepage of ground waters. Then, slopes are provided with balancing broken rock to form generating line so that the distance from the crest of lower subbench to generating line amounts to 0.5-0.6 m. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR EXPLOITATION OF DEEP OPEN CUTS | 1993 |
|
RU2066760C1 |
METHOD FOR ROCK BREAKING BY BLASTING | 1991 |
|
RU2017960C1 |
METHOD OF FORMATION OF OPENCAST NONMINING FLANK IN ARGILLACEOUS ROCKS | 2001 |
|
RU2208163C1 |
METHOD FOR ARRANGEMENT OF NON-WORKED SIDE OF QUARRY | 1994 |
|
RU2084633C1 |
METHOD FOR SLOPING OF BENCHES | 1991 |
|
RU2068094C1 |
PROCESS OF STRIP MINING OF DEPOSITS | 1993 |
|
RU2057937C1 |
METHOD FOR OPENCAST STEEP DEPOSIT MINING | 2005 |
|
RU2294434C1 |
METHOD OF MINERAL EXTRACTION FROM FLANKS OF OPENCAST | 1995 |
|
RU2087716C1 |
METHOD FOR RECONSTRUCTING QUARRY WITH TWO PROXIMATE ORE BODIES | 2002 |
|
RU2230192C1 |
METHOD OF SLOPING HIGH BENCHES ON OPENCAST LIMITING CONTOUR | 2000 |
|
RU2178079C1 |
Authors
Dates
1997-03-27—Published
1994-09-13—Filed