FIELD: mining.
SUBSTANCE: in process of drilling in the area of impervious roof above the productive formation an extended annular chamber is created, which communicates with the intra-column space through openings of the special casing coupling. The chamber and the intra-column space are filled with hydro-sealing liquid which creates a constant excess of the hydrostatic pressure of the liquid column above the formation pressure of the gas.
EFFECT: improvement of efficiency and quality of creation of gas wells, the safety of their operation due to creation of reliable, more quality and permanently working hydro-sealing preventing the migration of gas through the borehole annulus.
4 dwg
| Title | Year | Author | Number | 
|---|---|---|---|
| GAS WELL COMPLETION METHOD | 2011 | 
 | RU2484241C2 | 
| COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 | 
 | RU2793351C1 | 
| METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 | 
 | RU2087674C1 | 
| RESERVOIR SELECTIVE SEALING METHOD AT WELL CASING STRING FIRST STAGE CEMENTING | 2008 | 
 | RU2379475C1 | 
| METHOD OF PHYSICAL ABANDONMENT OF WELLS | 2014 | 
 | RU2576422C1 | 
| METHOD TO FIX PROCESS WELLS OF UNDERGROUND STORAGES OF GASEOUS AND LIQUID HYDROCARBONS (VERSIONS) | 2015 | 
 | RU2576416C1 | 
| WELL CEMENTING METHOD UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2021 | 
 | RU2775319C1 | 
| METHOD TO RESTORE TIGHTNESS OF BOREHOLE ANNULUS IN WELL OF GAS FIELD OR FIELD THAT CONTAINS NATURAL GAS IN ITS PRODUCE | 2010 | 
 | RU2431033C1 | 
| WELL COMPLETION METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2023 | 
 | RU2798540C1 | 
| METHOD FOR WELL COMPLETION | 2013 | 
 | RU2527978C1 | 
Authors
Dates
2014-11-27—Published
2013-07-10—Filed