FIELD: mining.
SUBSTANCE: in process of drilling in the area of impervious roof above the productive formation an extended annular chamber is created, which communicates with the intra-column space through openings of the special casing coupling. The chamber and the intra-column space are filled with hydro-sealing liquid which creates a constant excess of the hydrostatic pressure of the liquid column above the formation pressure of the gas.
EFFECT: improvement of efficiency and quality of creation of gas wells, the safety of their operation due to creation of reliable, more quality and permanently working hydro-sealing preventing the migration of gas through the borehole annulus.
4 dwg
Title | Year | Author | Number |
---|---|---|---|
GAS WELL COMPLETION METHOD | 2011 |
|
RU2484241C2 |
COMPLETION METHOD FOR A PRODUCTION WELL THAT HAS OPENED A TRANSITIONAL ZONE OF A GAS DEPOSIT | 2022 |
|
RU2793351C1 |
METHOD FOR SELECTIVE ISOLATION OF PRODUCTIVE RESERVOIR AT CEMENTATION OF PRODUCTION STRING | 1993 |
|
RU2087674C1 |
RESERVOIR SELECTIVE SEALING METHOD AT WELL CASING STRING FIRST STAGE CEMENTING | 2008 |
|
RU2379475C1 |
METHOD OF PHYSICAL ABANDONMENT OF WELLS | 2014 |
|
RU2576422C1 |
METHOD TO FIX PROCESS WELLS OF UNDERGROUND STORAGES OF GASEOUS AND LIQUID HYDROCARBONS (VERSIONS) | 2015 |
|
RU2576416C1 |
WELL CEMENTING METHOD UNDER CONDITIONS OF ABNORMALLY LOW RESERVOIR PRESSURES | 2021 |
|
RU2775319C1 |
METHOD TO RESTORE TIGHTNESS OF BOREHOLE ANNULUS IN WELL OF GAS FIELD OR FIELD THAT CONTAINS NATURAL GAS IN ITS PRODUCE | 2010 |
|
RU2431033C1 |
WELL COMPLETION METHOD AND DEVICE FOR ITS IMPLEMENTATION | 2023 |
|
RU2798540C1 |
METHOD FOR WELL COMPLETION | 2013 |
|
RU2527978C1 |
Authors
Dates
2014-11-27—Published
2013-07-10—Filed