FIELD: gas and oil producing industry. SUBSTANCE: during exploration of the field, presence of region with maximum content of condensate is determined. Field is drilled out with wells for injection of dry hydrocarbon gas. These wells are located in the region of maximum content of condensate at outline of gas pool. Field is also drilled with wells for withdrawal of condensate gas which are located up-dip. Raised part with minimum condensate content is drilled with additional rows of wells through which formation gas is withdraw. Dried gas from these wells is injected back into field. In course of development, content of hydrocarbons of products of producing wells is monitored. After fraction content is equalized, the field is operate as pure one in regime of depletion of formation energy. For this purpose, all wells are changed over for gas recovery. EFFECT: higher efficiency. 4 cl, 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF GAS-OIL FIELD | 1991 |
|
RU2018640C1 |
PROCESS OF EXPLOITATION OF OIL FIELD | 1990 |
|
RU2011805C1 |
METHOD FOR DEVELOPMENT OF GAS-CONDENSATE FIELD IN ACTIVE WATER- BEARING FORMATION | 1991 |
|
RU2023141C1 |
METHOD FOR INCREASE OF CONDENSATE RECOVERY IN DEVELOPMENT OF GAS-CONDENSATE POOL | 1992 |
|
RU2043485C1 |
METHOD OF DEVELOPING GAS-CONDENSATE FIELD WITH UNDERLYING OIL FRINGE | 0 |
|
SU1629504A1 |
METHOD FOR DEVELOPMENT OF OIL-GAS CONDENSATE FIELD | 1987 |
|
SU1527990A1 |
PROCESS OF CONDENSATE RECOVERY RATE INCREASE | 2006 |
|
RU2328591C2 |
METHOD OF ADDITIONAL DEVELOPMENT OF WATER-FLOODED SECTIONS OF GAS-CONDENSATE DEPOSIT OF OIL AND GAS CONDENSATE DEPOSIT | 2019 |
|
RU2744535C1 |
GAS-OIL DEPOSITION WITH SMALL WATER-FLOATING OIL CONTOURING | 1986 |
|
SU1410596A1 |
PROCEDURE FOR DEVELOPMENT OF GAS-CONDENSATE DEPOSIT WITH BIG GAS COLUMN IMPLEMENTING CYCLING PROCESS | 2010 |
|
RU2434123C1 |
Authors
Dates
1994-08-30—Published
1991-03-20—Filed