FIELD: gas and oil producing industry. SUBSTANCE: barrier is established between oil and gas parts. To establish barrier, oil is taken from field oil part to reduce thickness of oil part. Water barrier is made by injection of water through additional perforation of injection wells of gas part of field into zones above initial gas-oil contact. At the same time, gas is injected in gas part of field, and gas and oil and recovered. EFFECT: higher efficiency. 6 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL-GAS CONDENSATE FIELD | 1987 |
|
SU1527990A1 |
METHOD OF DEVELOPMENT OF OIL-AND-GAS DEPOSITS WITH BOTTOM WATER | 2012 |
|
RU2519243C1 |
GAS-OIL DEPOSITION WITH SMALL WATER-FLOATING OIL CONTOURING | 1986 |
|
SU1410596A1 |
METHOD OF HYDROCARBON DEPOSIT DEVELOPMENT | 2007 |
|
RU2334869C1 |
METHOD FOR DEVELOPING LOW-PENETRABLE OIL AND GAS OR GAS-CONDENSATE-OIL DEPOSITS BY SYSTEM OF HORIZONTAL-SLANTING WELLS | 2003 |
|
RU2242593C1 |
METHOD FOR EXTRACTING LOW-PENETRABLE OIL, GAS OR GAS-CONDENSATE-OIL DEPOSITS | 2003 |
|
RU2242592C1 |
METHOD OF DEVELOPMENT OF GAS-AND-OIL RESERVOIRS | 2013 |
|
RU2547530C1 |
METHOD OF DEVELOPMENT OF HYDROCARBON DEPOSIT | 2007 |
|
RU2334870C1 |
METHOD OF EXPLOITATION OF GAS-OIL POOLS | 1992 |
|
RU2027848C1 |
METHOD FOR DEVELOPMENT OF GAS-AND-OIL AND GAS-OIL-CONDENSATE FIELDS | 1991 |
|
RU2012782C1 |
Authors
Dates
1994-08-30—Published
1991-03-20—Filed