FIELD: development of gas and oil fields. SUBSTANCE: method consists in injection of water into central part of gas cap. Built up in zone of gas-oil contact is pressure providing miscibility of gas of gas cap and oil. This pressure is to be maintained during the whole period of field development. EFFECT: higher efficiency.
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR DEVELOPMENT OF OIL-GAS-CONDENSATE DEPOSIT | 1998 |
|
RU2123583C1 |
METHOD FOR DEVELOPMENT OF STRUCTURALLY COMPLEX OIL DEPOSIT WITH THIN OIL FRINGE | 1995 |
|
RU2095552C1 |
METHOD FOR DEVELOPMENT OF GAS-OIL FIELD | 1991 |
|
RU2018640C1 |
GAS-OIL DEPOSITION WITH SMALL WATER-FLOATING OIL CONTOURING | 1986 |
|
SU1410596A1 |
METHOD TO DEVELOP OIL DEPOSIT WITH GAS CAP (VARIANTS) | 2006 |
|
RU2312983C1 |
METHOD FOR DEVELOPMENT OF OIL GAS FIELDS | 1991 |
|
RU2049913C1 |
METHOD OF DEVELOPMENT OF OIL-AND-GAS DEPOSITS WITH BOTTOM WATER | 2012 |
|
RU2519243C1 |
METHOD FOR DEVELOPMENT OF OIL-GAS DEPOSIT | 1984 |
|
SU1208867A1 |
METHOD OF DEVELOPMENT OF OIL FRINGE AND UNDER-GAZ ZONE OF COMPLEX DEPOSITS | 2015 |
|
RU2606740C1 |
METHOD FOR BOREHOLE PRODUCTION OF HIGH-VISCOSITY OIL FROM AN OIL DEPOSIT WITH A GAS CAP | 2022 |
|
RU2779502C1 |
Authors
Dates
1994-05-15—Published
1991-07-02—Filed