FIELD: construction. SUBSTANCE: underground structure includes ring and relieving structures in form of cantilever which consists of curved and straight parts. Relieving structure is secured to ring of curved part. Curved part is made in form of arch of circle confined by angle of 20 deg. with curvature opposite to that of ring and conjugated with ring over horizontal diameter. Radial of circles of curved part of cantilever and ring satisfy the ratio of 4.75:1. EFFECT: improved reliability of structure. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR RECONSTRUCTING RAILWAY TUNNEL | 2023 |
|
RU2810978C1 |
METHOD FOR CONSTRUCTION OF UNDERGROUND STRUCTURE | 2009 |
|
RU2392388C1 |
PROCESS OF ERECTION OF MULTILEVEL UNDERGROUND STRUCTURE ( VARIANTS ) | 2003 |
|
RU2220258C1 |
SPORTS CENTER WITH ROOFED-IN SLEDDING-AND-BOBSLEIGH PATH | 2004 |
|
RU2257440C1 |
VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152481C1 |
METHOD FOR ERECTION OF VEHICULAR TRAFFIC TUNNEL OF URBAN RING HIGHWAY OF MEGAPOLIS | 1999 |
|
RU2152473C1 |
SUBTERRANEAN STRUCTURE AND METHOD OF ITS CONSTRUCTION | 0 |
|
SU781266A1 |
METHOD TO ERECT MULTISTORY SUBSURFACE STRUCTURE | 2009 |
|
RU2414563C1 |
METHOD FOR ERECTION OF URBAN RING HIGHWAY SECTION MEGAPOLIS | 1999 |
|
RU2152470C1 |
METHOD FOR ERECTING INTRA-CITY CIRCULAR MOTORWAY | 1999 |
|
RU2175367C2 |
Authors
Dates
1994-08-30—Published
1989-11-09—Filed