FIELD: hydraulic engineering. SUBSTANCE: after filling ground layer of embankment 2, banking 3 is arranged on embankment outer slope, and small ditches 4 are cut square to banking on layer surface. Closed space 5 formed during hydraulic filling is filled with water up to level ensuring filling of small ditches 4. EFFECT: higher reliability of structure due to uniform sagging of ground resulted from full saturation of base grounds and load embankment. 2 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF STORING INDUSTRIAL WASTE | 1991 |
|
RU2026122C1 |
METHOD FOR CONSTRUCTION OF RIVER EMBANKMENT ON WEAK GROUND | 0 |
|
SU1772306A1 |
METHOD OF ERECTING HYDRAULICALLY FILLED STRUCTURE | 0 |
|
SU1298297A1 |
METHOD OF FORMATION OF DUMP ON UNCONSOLIDATED GROUNDS | 0 |
|
SU1709092A1 |
WASHED-UP HYDRAULIC STRUCTURE | 1991 |
|
RU2039151C1 |
METHOD FOR ERECTION OF HYDRAULIC FILL DAM ON WATER-PERMEABLE FOUNDATION | 2008 |
|
RU2368728C1 |
METHOD OF ERECTION OF ALLUVIAL WATERWORKS | 2015 |
|
RU2612205C2 |
TAIL DEPOSIT MASS SURFACE STRENGTHENING METHOD | 0 |
|
SU1728378A1 |
METHOD FOR EXCAVATION OF WATER-SATURATED LOW-STRENGTH DEPOSITS AT EXISTING HYDRAULICALLY-FILLED BANK | 1993 |
|
RU2081963C1 |
METHOD FOR ERECTING EMBANKMENT FROM IMPROVISED MATERIALS | 1991 |
|
RU2032019C1 |
Authors
Dates
1994-09-15—Published
1991-07-02—Filed