FIELD: construction.
SUBSTANCE: invention relates to hydraulic engineering and can be used in erection of reclaimed waste storage facilities with a large consumption of water and its losses during operation. The method of erection of an alluvial hydraulic structure includes the operations on arrangement of a primary dike 5 of alluviated waste, an impervious screen, a settling pond with process water 4 for creation of an impervious screen. For formation of impervious screen to prepared inner slope of the primary dike 5 and the base 1 of the structure the continuous layer 2 of swellable material of natural moisture is bulked, for example, highly active sludge of metallurgical plants, on the graded surface of which the layer 3 of alluviated waste placed, and then through the pipeline system it is fed by process water from the settling pond 4 for wetting, full saturation, increase in volume and full compression of the continuous layer 2 of swellable material.
EFFECT: invention is aimed at increase the impervious effect of alluvial hydraulic structure to prevent contamination of soil and groundwater and reduce its construction costs.
1 dwg
Title | Year | Author | Number |
---|---|---|---|
HYDRAULIC SLUICING | 2023 |
|
RU2811441C1 |
METHOD FOR ERECTION OF ALLUVIAL STRUCTURE | 2024 |
|
RU2825332C1 |
GUARDING DIKE OF WATER ACCUMULATOR ON FROZEN BASE | 0 |
|
SU1701796A1 |
METHOD FOR SCREEN OF WATER-PERMEABLE SIDES OF HYDRAULIC FILL BASIN | 0 |
|
SU1728345A1 |
COMPARTMENT OF SLUDGE POND OF INDUSTRIAL ENTERPRISES WASTES | 2009 |
|
RU2385988C1 |
ALLUVIAL HYDRAULIC STRUCTURE | 2020 |
|
RU2742145C1 |
METHOD OF RAISING EMBANKMENT FROM LOCAL ACCESSIBLE MATERIAL | 0 |
|
SU1710658A1 |
METHOD FOR ERECTION OF HYDRAULIC FILL DAM ON WATER-PERMEABLE FOUNDATION | 2008 |
|
RU2368728C1 |
METHOD OF ERECTION OF EARTH WORKS | 0 |
|
SU1671764A1 |
METHOD OF STORING INDUSTRIAL WASTE | 1991 |
|
RU2026122C1 |
Authors
Dates
2017-03-03—Published
2015-08-10—Filed