FIELD: transportation of water-oil-gas mixtures. SUBSTANCE: mixture is delivered from collecting station through pipeline and through unit for cleaning it of mechanical impurities to the suction end of double-screw pump from its outlet, into a transport line. At the pump outlet the mixture is divided into liquid and gas phases by means of flow divider. The other part of liquid phase is returned through bypass pipeline with control gate to pump suction so as to maintain total gas content at the suction side below the stalling limit. EFFECT: higher efficiency. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DEVICE FOR PRELIMINARY DISPOSAL OF WATER IN GATHERING SYSTEMS OF OIL PRODUCTION WELLS | 1997 |
|
RU2135886C1 |
METHOD OF ACQUISITION AND TRANSPORTATION OF PRODUCTION OF OIL WELLS WITH HIGH GAS FACTOR AND SYSTEM FOR ITS IMPLEMENTATION | 2009 |
|
RU2406917C2 |
METHOD TO TEST GAS SEPARATORS ON GAS-LIQUID MIXTURES AND METHOD FOR ITS REALISATION | 2013 |
|
RU2531090C1 |
WELL METERING PUMP INSTALLATION | 1997 |
|
RU2135743C1 |
METHOD OF PUMPING A GAS-LIQUID MIXTURE | 0 |
|
SU1536158A1 |
METHOD FOR TESTING THE SEPARATOR FOR THE EFFICIENCY OF GAS SEPARATION AND A STAND FOR ITS IMPLEMENTATION | 2022 |
|
RU2790111C1 |
METHOD AND DEVICE FOR PROTECTING PIPELINE AGAINST CORROSION | 2004 |
|
RU2277668C2 |
METHOD OF GAS-SEPARATORS TESTING ON GAS-LIQUID MIXTURES AND BENCH FOR ITS IMPLEMENTATION | 2017 |
|
RU2647175C1 |
METHOD FOR DEEP OIL WELL BOTTOM AREA CLEANING | 2004 |
|
RU2266403C1 |
METHOD OF DEVELOPING OIL POOL | 1995 |
|
RU2089724C1 |
Authors
Dates
1994-09-30—Published
1992-05-09—Filed