FIELD: glacial hydraulic structure erection. SUBSTANCE: construction has a safety structure made along the perimeter of the glacial structure whose nucleus is the solid mass of ice and the heat-insulating layer. A rigid hollow structure filled with the material with the freezing point equal or less than that of the material of the frozen solid mass is made from the inner surface along the perimeter of the heat-insulating layer. A cooling ventilating system of tubes is made on the outer surface of the glacial nucleus. EFFECT: reduction of the expenditure on the construction and on the repairs of the glacial structure. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
ICE BERTH | 2021 |
|
RU2764806C1 |
METHOD OF DISTILLATION OF MINERALIZED WATER AND PLANT FOR REALIZATION OF THIS METHOD | 2002 |
|
RU2206512C1 |
METHOD FOR STORAGE OF LIQUID FUEL IN PERMAFROST GROUND | 0 |
|
SU1713856A1 |
DEVICE FOR PROVIDING TESTING OF MEDIUM-SIZED SAMPLES OF LABORATORY SEA ICE IN AN ICE BASIN | 2018 |
|
RU2698976C1 |
METHOD FOR ERECTION OF OBJECTS | 2008 |
|
RU2360826C1 |
DEVICE FOR BREAKING ICE COVER | 1999 |
|
RU2175425C2 |
PIER | 2013 |
|
RU2535726C1 |
METHOD OF ERECTING A HYDRAULIC STRUCTURE | 0 |
|
SU1159980A1 |
MINERALIZED WATER SWEETENING APPARATUS | 2003 |
|
RU2226504C1 |
ICE EXPERIMENTAL MODEL BASIN FOR TESTING SHIPS AND SEA ENGINEERING STRUCTURES AND METHOD OF USE OF SUCH MODEL BASIN | 2001 |
|
RU2210516C2 |
Authors
Dates
1994-10-30—Published
1991-04-12—Filed