FIELD: hydraulic engineering. SUBSTANCE: crane is positioned at canal berm and trailer is charged with plates from a vehicle. As the crane with trailer moves film is unwound from a roll and pressed to bed of the canal by flexible weights. After the crane with trailer stops laying of plates on the film is performed. The process is then repeated. EFFECT: enhanced efficiency. 3 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
DEVICE FOR PLACING CONCRETE | 1991 |
|
RU2049191C1 |
DEVICE FOR PLACING CONCRETE | 1991 |
|
RU2049192C1 |
METHOD OF LAYING ANTISEEPAGE FILM-TYPE SCREEN ON SLOPES AND BOTTOM OF POND | 0 |
|
SU1742404A1 |
METHOD FOR BUILDING SOIL/FILM SCREEN ON A LARGE SIZE CHANNEL | 1991 |
|
RU2041316C1 |
METHOD OF FORMING AN ANTISEEPAGE SCREEN OF THE FILM PANEL | 1991 |
|
RU2022090C1 |
METHOD FOR DEVELOPING ANTIFILTRATION COATING | 2012 |
|
RU2494192C2 |
METHOD OF CONSTRUCTING PREFABRICATED LINING OF SLOPES OF HYDRAULIC STRUCTURES | 0 |
|
SU1298293A1 |
SLOPE CONCRETING DEVICE | 2004 |
|
RU2272862C1 |
METHOD OF FLEXIBLE FILM MATERIAL DIAPHRAGM ERECTION IN A TRENCH | 1991 |
|
RU2006548C1 |
ARRANGEMENT FOR LAYING DRAINAGE SYSTEM | 1991 |
|
RU2013498C1 |
Authors
Dates
1994-11-30—Published
1991-03-12—Filed