FIELD: hydraulic engineering. SUBSTANCE: packet 5 formed by folding film 6 into two stacks beginning from opposite edges to the center is placed in trench 4 of bottom 2 of pit 1 of the channel. Then soil strips 7 are cut off. The strips are parallel to pit 1 axis. Film 6 is folded from packet 5 on the place, where the soil was cut off. Then film 6 is held down by soil 3 in the direction from pit 1 axis towards its sides 8. EFFECT: high technological effectiveness. 3 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF FORMING AN ANTISEEPAGE SCREEN OF THE FILM PANEL | 1991 |
|
RU2022090C1 |
DEVICE FOR PLACING CONCRETE | 1991 |
|
RU2049191C1 |
METHOD AND DEVICE FOR CONSTRUCTING COMBINED CANAL FACING | 1991 |
|
RU2023790C1 |
DEVICE FOR PLACING CONCRETE | 1991 |
|
RU2049192C1 |
METHOD OF FLEXIBLE FILM MATERIAL DIAPHRAGM ERECTION IN A TRENCH | 1991 |
|
RU2006548C1 |
ARRANGEMENT FOR LAYING DRAINAGE SYSTEM | 1991 |
|
RU2013498C1 |
SCREEN LAYING MACHINE | 0 |
|
SU1765278A1 |
DEVICE FOR FORMING DRAIN FROM LOOSE MATERIALS | 1990 |
|
RU2023820C1 |
METHOD FOR FORMATION OF BUTT-JOINT OF PANELS OF FILM CURTAIN | 1991 |
|
RU2020201C1 |
METHOD AND DEVICE FOR ASSEMBLING ANTISEEPAGE SCREEN | 0 |
|
SU1763557A1 |
Authors
Dates
1995-08-09—Published
1991-06-25—Filed