FIELD: electrical power engineering. SUBSTANCE: line transformers are connected in series on ends of power line. Shunting reactors are placed into their excitation windings to control voltage in line by control over excitation of line transformers. Voltage is set depending on power transfer which corresponds to preset drain of reactive power to power systems. EFFECT: improved reliability of control. 1 dwg
Authors
Dates
1994-12-15—Published
1992-06-09—Filed