FIELD: civil engineering. SUBSTANCE: guiding device at a proper angle is installed at 0.15 to 0.25 B distant from foundation face to guide puncher. Well depth is 1/2 to 1/3 of that for puncher length. Then the puncher is withdrawn and the well is filled with inert material, then the puncher is advanced again the whole well depth. In so doing, inert material is rammed in well walls and forms densified inert material. Then the puncher is withdrawn, well is filled with inert material up to the top, and the puncher is inserted again, lower the bound of densified material. EFFECT: increased efficiency of densification for foundation base in the course of reconstruction or reinforcement of trouble buildings, as well as wider application at the expense of sand and wet clay soils. 4 dwg, 1 tbl
Title | Year | Author | Number |
---|---|---|---|
METHOD OF DANGEROUS AND RECONSTRUCT ABLE BUILDING FOUNDATIONS REINFORCEMENT | 2002 |
|
RU2229562C1 |
METHOD OF ARRANGEMENT OF DRIVEN PILE IN A WELL WITH AN EXTENDED BASE | 2018 |
|
RU2678172C1 |
METHOD FOR SOIL AND DEVICE FOR ITS IMPLEMENTATION | 2014 |
|
RU2588511C2 |
METHOD FOR FIXATION OF OVERWETTED CLAYEY AND COLLAPSING SOILS | 2008 |
|
RU2382850C1 |
REINFORCEMENT METHOD OF FOUNDATION BASE DURING RECONSTRUCTION OF BUILDINGS AND STRUCTURES | 2019 |
|
RU2708929C1 |
METHOD AND DEVICE FOR CAST-IN-PLACE PILE FORMING | 2002 |
|
RU2236506C2 |
METHOD FOR STRENGTHENING EARTHWORK | 2016 |
|
RU2633846C1 |
DRIVE PILE DEVICE IN PUNCHED WELL WITH WIDER BASE | 2014 |
|
RU2582530C2 |
METHOD OF DEEP GROUND COMPACTION | 2000 |
|
RU2206661C2 |
PILE IN THE PUNCHED WELL ARRANGEMENT METHOD (EMBODIMENTS) | 2017 |
|
RU2663420C1 |
Authors
Dates
1995-01-20—Published
1993-03-23—Filed