FIELD: ferroconcrete carcass engineering. SUBSTANCE: bondings are made in the form of struts disposed per floor in the upper part of every floor. The upper end of each strut is connected to the metallic transverse members of intercolumn boards of the roof, the lower end to the embedded fitting of the column. Extra bondings which are made of the same members as the principal ones and have their profile are placed in the direction perpendicular to them. The lower ends of the extra bondings is attached to the embedded fittings of the columns, the upper end to those of the collar beam. The establishment of the bondings in two mutually perpendicular directions is used mainly in the binding carcass. In the frame carcass enough to establish bondings only in the direction perpendicular to that of rigid frames. The relationship of the horizontal projection of the strut "a" to the value of the spacing of the intercolumn board "l" is in the range of and the relationship of the vertical projection of the strut "b" to the column height on the floor "h" is in the range of . The struts are mounted on each column in binding foundations. EFFECT: facilitated manufacture. 2 cl, 6 dwg
Title | Year | Author | Number |
---|---|---|---|
SECTIONAL REINFORCED-CONCRETE CEILING | 1992 |
|
RU2045633C1 |
FERROCONCRETE SKELETON OF MULTISTOREY BUILDING | 0 |
|
SU1530707A1 |
VERTICAL POST OF CONNECTION FRAMEWORK OF MULTISTOREY BUILDING | 0 |
|
SU844700A1 |
BUILDING FRAME | 0 |
|
SU1620572A1 |
MULTISTOREY BUILDING FRAME | 2002 |
|
RU2233952C1 |
FRAMEWORK UNIVERSAL PREFABRICATED ARCHITECTURAL AND CONSTRUCTION SYSTEM | 2016 |
|
RU2634139C1 |
FRAMEWORK AND METHOD FOR ERECTION OF BUILDING | 1994 |
|
RU2065907C1 |
FLOOR | 0 |
|
SU1016457A1 |
LARGE-BLOCK BUILDING AND METHOD TO MANUFACTURE ITEMS FOR ITS ERECTION | 2012 |
|
RU2498024C1 |
JOINTLESS FRAME OF BUILDING, STRUCTURE | 2009 |
|
RU2501915C2 |
Authors
Dates
1995-01-20—Published
1992-05-19—Filed