FIELD: environment control. SUBSTANCE: waste is prepared in the form of pulp with specific gravity of 1,3 g/сm3 and is pumped into the chamber to force brine into well opening the porous sediment. EFFECT: improved reliability. 2 cl, 1 dwg
Title | Year | Author | Number |
---|---|---|---|
TECHNIQUE TO BURY LIQUID WASTE IN THE FORM OF BRINE CONTAINED IN UNDERGROUND SALT CHAMBER | 2001 |
|
RU2221148C2 |
DRILLING WASTES UNDERGROUND BURIAL | 2013 |
|
RU2529197C1 |
METHOD OF BURYING INDUSTRIAL WASTES IN UNDERGROUND SALT CHAMBERS | 1996 |
|
RU2099263C1 |
METHOD FOR UNDERGROUND LEACHING OF SALTS FROM DEPOSITS | 1995 |
|
RU2081309C1 |
METHOD FOR EXTRACTING SALTS FROM SALT DEPOSITS | 2002 |
|
RU2229591C1 |
METHOD FOR COMBINED DEVELOPMENT OF OIL AND POTASSIUM DEPOSITS | 1996 |
|
RU2095556C1 |
METHOD FOR BURIAL OF LIQUID WASTES | 2018 |
|
RU2710155C2 |
METHOD OF BURIAL OF PULPY DRILLING WASTES IN DEPOSIT DEVELOPMENT BY BOREHOLE SYSTEMS | 2001 |
|
RU2196884C2 |
METHOD OF DISPOSAL OF WELL DRILLING WASTE INTO ABANDONED WELL | 2015 |
|
RU2616302C1 |
METHOD OF ESTIMATION OF PAYLOAD CAPACITY OF NATURAL CRYOGENIC RESERVOIRS | 2014 |
|
RU2570098C1 |
Authors
Dates
1995-02-09—Published
1991-01-11—Filed