FIELD: pipe construction. SUBSTANCE: on the section of soft-carrying grounds the pipeline is laid with a flexible curve in the horizontal and vertical planes with the deepening of 0.3-0.5 m relative to the marks of the pipe laying on the adjacent sections of carrying grounds. EFFECT: facilitated manufacture. 2 cl, 4 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF CONSTRUCTION OF PIPELINE IN COMPLICATED NATURAL CONDITIONS | 1991 |
|
RU2028534C1 |
METHOD OF LAYING UNDERGROUND PIPELINE IN SETTLEMENT SOILS (VERSIONS) | 2004 |
|
RU2249144C1 |
METHOD OF ERECTION OF PIPE LINE IN PERMAFROST SOILS (VERSIONS) | 2004 |
|
RU2244192C1 |
METHOD FOR LAYING UNDERGROUND PIPELINES IN FROZEN GROUNDS | 0 |
|
SU1810705A1 |
METHOD FOR DRIVING PIPELINES OVER SLOPES | 1999 |
|
RU2170796C2 |
METHOD OF LAYING UNDERGROUND PIPELINE IN SEISMIC ZONES | 2004 |
|
RU2250409C1 |
METHOD OF LAYING UNDERGROUND MAIN PIPELINE | 2014 |
|
RU2584764C2 |
METHOD FOR ERECTION OF PIPELINE IN FROZEN AND WATERLOGGED SOIL | 2010 |
|
RU2452886C2 |
METHOD OF CONSTRUCTING BURIED PIPELINE IN CROSSING SECTION WITH FORECAST CONCENTRATED DEFORMATIONS OF ENCLOSING STRATA | 2011 |
|
RU2460926C1 |
METHOD OF REPAIR OF SAGGING AND WASHED-OUT SECTIONS OF UNDERGROUND PIPE LINE | 2001 |
|
RU2196269C2 |
Authors
Dates
1995-03-10—Published
1991-12-19—Filed