FIELD: construction of pipelines. SUBSTANCE: pipeline is laid in a zigzag manner in valleys of temporary water passages. Transition from one slope to another one is accomplished in the form of an expansion U-bend, whose flange is laid at the level of the local base-line of erosion. Pipeline section between transitions are laid with observance of equality of the horizontal angle of turning of the pipeline longitudinal axis to the natural slope of the water passage course in this section. Pipeline sections are placed above the maximum high-water level and below the first aboveflood-plain level. EFFECT: facilitated procedure. 1 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD FOR PROTECTION OF COASTAL LANDSCAPE OF RIVERS AGAINST UNDERFLOODING | 2014 |
|
RU2552949C1 |
METHOD OF THE UNDERGROUND PIPE LAYING ON THE SECTIONS OF SOFT-CARRYING GROUNDS | 1991 |
|
RU2030672C1 |
METHOD FOR PHASED COMPLEX ENGINEERING PROTECTION OF GENERAL PLANNING EMBANKMENT | 2008 |
|
RU2390605C1 |
MELIORATIVE SYSTEM | 1992 |
|
RU2050436C1 |
METHOD OF LAND RECLAMATION IN PERMAFROST ZONE | 2022 |
|
RU2813665C1 |
METHOD OF ANTI-EROSION PROTECTION OF RELIEF ON POLDERS FOR GROWING HERBS | 2014 |
|
RU2563146C1 |
METHOD TO DEHYDRATE LANDSLIDE BODY | 2013 |
|
RU2537715C1 |
METHOD FOR CASCADE DEHYDRATION OF LANDSLIP BODY OF SLOPES OR WALLS | 2015 |
|
RU2590153C1 |
DAM FREE HYDRAULIC POWER PLANT | 1992 |
|
RU2057843C1 |
DAM OF SOIL MATERIALS | 2010 |
|
RU2486309C2 |
Authors
Dates
1995-02-09—Published
1991-06-24—Filed