FIELD: construction. SUBSTANCE: building is erected as follows. Fastened to concrete base are vertical reinforcing cages, and hollow blocks are mounted tier by tier. First, corner blocks are installed, and then, using same blocks, spans are formed by turning them with their end walls to spans. Then, laid are row and final blocks. T-shaped joint of outer and inner walls are formed by tier laying of corner and final blocks, placing axis of final block along axis of outer wall, and axis of corner block, along axis of partition. Cross-shaped joint of crossing of inner walls is formed with the help of final block whose width and length are equal to wall thickness when installing them by tiers in mutually perpendicular positions. Installed simultaneously with block installation are boxes with pipes into block holes for electric wiring and fastened them to installation loops. Installed is horizontal reinforcement which serves as retainer of blocks from with self-hardening material which fills vertical walls and horizontal toothing due to the fact that block partitions are smaller than size of their walls. EFFECT: reduced labor input of block installation, simplified installation and higher quality of erected structure. 3 cl, 7 dwg
Title | Year | Author | Number |
---|---|---|---|
METHOD OF BUILDING ERECTION FROM HOLLOW BLOCKS | 1995 |
|
RU2098571C1 |
WOODEN PANEL AND SECTIONAL BUILDING OF SUCH PANELS | 1996 |
|
RU2107135C1 |
METHOD OF BUILDING RECONSTRUCTION | 1995 |
|
RU2078885C1 |
NUCLEAR FUEL COOLING POND | 1991 |
|
SU1827141A3 |
CONSTRUCTION METHOD | 2019 |
|
RU2706288C1 |
WALL MADE OF LARGE BLOCKS | 1998 |
|
RU2153560C2 |
METHOD FOR CONSTRUCTING BUILDING ADDITION | 2010 |
|
RU2442868C1 |
FRAMED BUILDING | 1996 |
|
RU2104371C1 |
UNIVERSAL SET OF SMALL-SIZE BUILDING BLOCKS FOR CONSTRUCTION OF MULTISTOREY BUILDINGS AND STRUCTURES | 2023 |
|
RU2817605C1 |
LARGE-BLOCK BUILDING AND METHOD TO MANUFACTURE ITEMS FOR ITS ERECTION | 2012 |
|
RU2498024C1 |
Authors
Dates
1995-04-20—Published
1993-02-26—Filed