FIELD: construction. SUBSTANCE: ends of branch pipes have quick-acting joint in form of socket slots for locking of reinforcing bars that is ensured by flexible springy walls of slots. Special bosses replace known gaskets to form reinforcement protective layer. Labor consuming operation of pulling reinforcing bars through holes in ends of branch pipes is replaced by simple and quick operation of direct connection of branch pipe to ready reinforcing fabric. Operation for installation of known gaskets for protective layer is excluded. EFFECT: simplified design of joint of branch pipes and reinforcement of external layers, and reduced labor input for manufacture of spatial reinforcing cage in course of panel formation. 5 cl, 2 dwg
Title | Year | Author | Number |
---|---|---|---|
STRUCTURAL PANEL AND METHOD FOR MAKING SAME | 1992 |
|
RU2038450C1 |
THREE-LAYER R C PANEL | 0 |
|
SU1728418A1 |
CURVILINEAR MULTILAYER FENCE PANEL | 1999 |
|
RU2161231C1 |
EXTERNAL WALL PANEL | 0 |
|
SU1446251A1 |
METHOD FOR FORMING THREE-LAYER REINFORCED CONCRETE ARTICLES | 0 |
|
SU1298099A1 |
0 |
|
SU1670061A1 | |
METHOD OF MONOLITHIC THREE-LAYERED CONSTRUCTION PRODUCTION | 1991 |
|
RU2010928C1 |
METHOD FOR PROTECTING SURFACE OF CONSTRUCTION OBJECTS | 1998 |
|
RU2139980C1 |
METHOD OF PRODUCTION OF THREE-LAYER GUARDING CLAYDITE-CONCRETE PANEL | 2002 |
|
RU2215649C1 |
METHOD FOR MAKING LAMINATE STRUCTURES AND THREE-LAYER WALL PANEL SYSTEM | 1997 |
|
RU2141405C1 |
Authors
Dates
1995-04-20—Published
1993-05-24—Filed